Zero-Clearance Fireplace Requirements - Vermont Castings VCFDVI31 Installation And Operating Instructions Manual

Clean face direct vent fireplace insert firebox
Table of Contents

Advertisement

VCFDVI31 Gas Fireplace Insert
ZeRO-CleARANCe (MetAl) FIReplACe
RequIReMeNts
The damper and grate must be removed.
The smoke shelf, internal baffles, screen, refractory and
metal or glass doors may be removed (if applicable).
Do not remove or alter the insulation or any structured
rigid frame members (metal sides, floor, door frames,
face of the fireplace, etc.).
IMpORtANt: Please review the following carefully.
It is normal for inserts fabricated of steel to give off some
expansion and/or contraction noises during the start up or
cool down cycle. Similar noises are found with your furnace
heat exchanger or car engine.
It is not unusual for your insert to give off some odor the
first time it is burned. This is due to the curing of the paint
and any undetected oil from the manufacturing process.
please ensure that your room is well ventilated. OpeN
All WINDOWs DuRING INItIAl BuRN OFF/CuRING
phAse.
Burn your insert for at least six (6) hours on "HIGH" the
first time you use it. Place the fan in the "OFF" position
during this time.
10
Insulation
Shelf
Masonry Lining or Refractory
Grate
Masonry Lining or Refractory
Figure 8 -
Metal Fireplace Zero-Clearance Requirements
Installer must attach red warning plate to
the inside of the firebox of fireplace with
screws supplied.
Do not cut any sheet metal parts of the
fireplace in which this gas fireplace insert
is installed. thIs Is stRICtly pROhIB-
IteD!
If factory-built fireplace has no gas access
hole(s) provided, drill a 1.5" (37.5 mm) or
less through lower sides or bottom of
firebox. you must plug the access hole
with noncombustible insulation after gas
supply line has been installed.
If your factory-built fireplace has air pas-
sages on the face for zero clearance, DO
NOt BlOCK these pAssAGes!
INstAllAtION
20304166

Advertisement

Table of Contents
loading

Table of Contents