Haier AB242ACBEA Service Manual page 31

Commercial air conditioning 24 28 universal outdoor unit air conditioning
Hide thumbs Also See for AB242ACBEA:
Table of Contents

Advertisement

(2) Ceiling height
Indoor unit can be installed on ceiling of 2.5-3m in height. (Refer to
Manual of ornament panel.)
(3) Install suspending bolt. Check if the installation place is strong enough to hold weight. Take
necessary measures in case it is not safe. (Distance between holes are marked on paper pattern.
Refer to paper pattern for place need be reinforced)
Air outlet
1500 Over
5.3.3 Preparation
(1) Position of ceiling opening between unit and suspending bolt.
AB14, 18
Installation space
Air outlet
Air inlet
1500 Over
Distance between
suspending bolts 460mm
Indoor unit 570mm
Ceiling opening 600mm
Ornament panel 630mm
INSTALLATION INSTRUCTIONS
8
Foeld setting and Installation
Air inlet
Air outlet
Air inlet
1500 Over
Unit: mm
Overlap between ceiling and
ornament panel shall be 15mm
Ceiling
Ornament panel
1500 Over
Suspending bolts

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents