5.0 FINISHING
5.1
BRICKS AND BAFFLES INSTALLATION
OPERATION OF THE APPLIANCE WITHOUT THE BAFFLES CAN RESULT IN EXCESSIVE TEMPERA-
TURES THAT COULD DAMAGE THE APPLIANCE, CHIMNEY AND THE SURROUNDING ENCLOSURE.
A.
Install (1101) four (A) bricks and one (C) brick or (1402) six (A) bricks along both sides of the
appliance. Before installing the back bricks, loosen the screw holding the retainer and ensure that it
has been moved forward. Install the four (A) bricks and two (D) bricks along the back wall by pivoting
the bricks up under the brick retainer. Retighten the screw. NOTE: Center (D) bricks have been
notched.
B.
Carefully pivot fi bre baffl e (G) and (H) up onto the top of the side brick. Slide it over onto the fl ange
of the manifold. Ensure that the top baffl es are pushed all the way to the rear of the fi rebox, leaving a
minimum of a 1" gap along the front. This will allow the fl ue gases to escape the fi rebox.
C.
Install the bottom (1101) four (A) bricks and two (B) bricks or (1402) six (A) bricks and two (B) bricks,
working from the back of the appliance forward.
D.
Install the two (B) bricks, one (E) brick and one (F) brick along the front as illustrated.
NOTE: Do not operate if baffl e and manifold shield are not in position.
1101
A
C
A
A
A
A
A
E
B
B
A
1 1/4" x 4 1/2" x 9"
B
1 1/4" x 3" x 9"
C
1 1/4" x 4 1/2" x 4 1/2"
1 1/4" x 4 1/2" x 9"
D
(Notched)
E
1 1/4" x 2 1/4" x 9"
G
G
D
A
D
A
A
A
B
A
B
C
A
A
A
A
A
F
WARNING
!
F
1 1/4" x 2 1/2" x 6 1/8"
9" x 1" x 12"
I
(Fibre Baffl es)
9" x 2" x 16 1/2"
J
(Fibre Baffl es)
1402
A
A
A
A
A
A
A
A
E
B
F
B
H
H
D
D
A
A
A
A
B
A
B
A
A
A
A
A
A
W415-0764 / B / 10.28.11
13
A
A
A