Installing the SPARC Enterprise
T5140 and T5240 Servers
This chapter provides instructions for installing the servers into an equipment rack.
Note – If your rackmounting kit came with its own instructions, use the instructions
in your rackmounting kit instead of the instructions in this chapter. After performing
the server installation, proceed to
first-time power on.
This chapter contains the following sections:
"Installing the Servers in a Rack" on page 19
■
"Installing the Cable Management Arm for Both Servers" on page 29
■
"Connecting the Server Cables for Both Servers" on page 35
■
"To Connect the Service Processor Serial Management Port" on page 36
■
"To Connect the Service Processor Network Management Port" on page 37
■
"To Connect the Ethernet Network Cables" on page 38
■
"Managing Cables With the CMA" on page 40
■
"Dismounting the Servers" on page 41
■
Note – References to left and right are from your viewpoint as you face either the
front or rear of the equipment.
Installing the Servers in a Rack
Note – Ensure that you have all of the parts in the rackmounting kit before you
begin the installation of the server.
"Powering On the System" on page 43
for
19