Mounting And Installation; Preparing The Mounting And Installation - Vaillant VWZ MPS 40 Installation Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

4

Mounting and installation

i
Notes
All the drawings dimensions are shown in
mm.
4.1
Preparing the mounting and
installation
4.1.1
Delivery and installation on site
4.1.1.1
[product] unpack
∙ Remove the product from its box.
∙ Remove the protective fi lm from all parts of the product.
4.1.1.2
Check scope of delivery
∙ Please check the scope of delivery for completeness.
- 1 Tank + 3 plug 1" + 1 plug 1"1/4
- 1 accessories bag
- 1 bag of documents (1 operating and installation)
4.1.2
Observing distances and mounting
clearances
4.1.2.1
Product and connection dimensions
3 6
0
0020153953_00 - 01/13 - Vaillant
4.1.2.2
∙ Make sure that no item that can easily catch fi re is in
direct contact with the components, which may reach a
temperature greater than 80°C.
∙ Make sure that there is a minimum distance of 200 mm
between items that can easily catch fi re and the hot
surfaces.
4.1.2.3
∙ Ensure the distances indicated on the diagram.
This will ensure that the connections to the water can be
accessed and inspected.
Additional clearances around the appliance may be
advantageous for its installation and maintenance.
0
3 5
i
MOUNTING AND INSTALLATION
180
87
101
212
Distance to infl ammable parts
Mounting clearances
200
200
mini.
mini.
Notes
* Clearance necessary for the installation or
maintenance of the appliance.
180
220
>600*
180
EN
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents