Gas & Electrical Connection; Final Preparation; Performance Checklist; Bracket Installation - Viking 30" Installation Manual

Built-in gas cooktops
Hide thumbs Also See for 30":
Table of Contents

Advertisement

Gas & Electrical Connection

Bracket Installation

16

Final Installation

Final Preparation

• New units are cleaned at the factory
• All stainless steel parts should be wiped
to remove any visible signs of dirt, oil,
grease, etc. remaining from the
manufacturing process. Some stainless
steel parts may have a plastic protective
wrapper which must be peeled off. The
cooktop should be washed thoroughly
with hot, soapy water and then rinsed and
wiped dry to remove these film residues
and any installation dust or debris before
being used for food preparation.

Performance Checklist

A qualified installer should carry out the
following checks:
Check top burner ignition. The low flame
should light at every port.
Starting with the left
front burner, turn the corresponding knob
to the HI position – see drawing for
proper flame height.
Repeat steps for other burners.
17
regularly with hot, soapy water
and with a liquid cleanser designed for
this material if build-up occurs. DO NOT
USE steel wool, abrasive cloths, cleansers,
or powders. If it is necessary to scrape
stainless steel to remove encrusted
material, soak with hot, wet cloths to
loosen the material, then use a wood
or nylon scraper. DO NOT USE a metal
knife, spatula, or any other metal tool
to scrape stainless steel. Scratches are
almost impossible to remove.

Advertisement

Table of Contents
loading

This manual is also suitable for:

36"

Table of Contents