Cooling Mode; Fan Only Mode; Start-Up Procedure And Adjustment; Furnace Operation - Goodman GME8 Installation Instructions Manual

Gas-fired warm air furnace
Hide thumbs Also See for GME8:
Table of Contents

Advertisement

The circulator blower remains on high speed for thirty
seconds, then switches to low heat speed for the remainder
of the selected heat off delay period. For example, the
selected heat off delay period is 150 seconds. The circulator
blower operates at high heat for 30 seconds and at low
speed for 150 - 30 = 120 seconds.
Furnace awaits the next call from thermostat.
(M
DIP S
ODE
WITCH IS SET TO
The normal operational sequence in sequence is as follows:
R and W thermostat contacts close, initiating a call for heat.
Integrated control module performs safety circuit checks.
Induced draft blower is energized for 15 second prepurge
period causing pressure switch contacts to close.
Igniter warm up begins after 15 second prepurge expires.
Low and high-stage gas valves open at end of igniter warm
up period, delivering gas to burners and establishing flame.
High-stage gas valve closes after five seconds; low-stage
gas valve remains open.
Integrated control module monitors flame presence. Gas
valve will remain open only if flame is detected.
Circulator blower is energized on low heat speed following
a fixed thirty second blower on delay. Electronic air cleaner
terminals are energized with circulator blower.
Furnace is now operating in low-stage heating mode.
Furnace operates; integrated control module monitors
safety circuits continuously.
If low-stage delay period expires, control will shift operation
from low-stage heating mode operation to high-stage
heating mode operation. Control will energize circulator
blower high heat speed and high stage gas valve.
Furnace is now operating in high-stage heating mode.
R and W thermostat contacts open, completing the call for
heat.
Induced draft blower is de-energized following a fifteen
second post purge.
Circulator blower is de-energized following a heat off delay
period (selectable 100 or 150 seconds; factory set at 150
seconds).
If the furnace is operating in the low-stage heating mode
when thermostat contacts open, circulator remains at low
heat speed for the selected delay off period.
If the furnace is operating in high-stage heating mode when
the thermostat contacts open, the circulator blower
remains at high heat speed for thirty seconds. The circulator
blower then switches to low heat speed for the remainder
of the selected heat off delay period. For example, the
selected heat off delay period is 150 seconds. The circulator
blower operates at high heat for 30 seconds and at low
speed for 150 - 30 = 120 seconds.
Furnace awaits the next call from thermostat.
"2 STG"
)
POSITION
C
M
OOLING
ODE
The normal operational sequence in cooling mode is as follows:
R and Y thermostat contacts close, initiating a call for cool.
Integrated control module performs safety circuit checks.
Outdoor fan and compressor are energized.
Circulator blower is energized on cool speed following a
fixed five second on delay. Electronic air cleaner terminals
are energized with circulator blower.
Furnace circulator blower and outdoor cooling unit run,
integrated control module monitors safety circuits
continuously.
R and Y thermostat contacts open, completing the call for
cool.
Outdoor fan and compressor are de-energized.
Circulator blower is de-energized following a fixed forty five
second cool off delay period. Electronic air cleaner
terminals are de-energized.
Furnace awaits the next call from thermostat.
F
O
M
AN
NLY
ODE
The normal operational sequence in fan only mode is as follows:
R and G thermostat contacts close, initiating a call for fan.
Integrated control module performs safety circuit checks.
Circulator blower is energized on low heat speed. Electronic
air cleaner terminals are energized.
Circulator blower runs, integrated control module monitors
safety circuits continuously.
R and G thermostat contacts open, completing the call for
fan.
Circulator blower is de-energized. Electronic air cleaner
terminals are de-energized.
Furnace awaits the next call from thermostat.XII. Start-up
Procedure and Adjustment
XII. START-UP PROCEDURE AND ADJUSTMENT
Furnace must have a 115 VAC power supply properly connected
and grounded. Proper polarity must be maintained for correct
operation. An interlock switch prevents furnace operation if the
blower door is not in place. Keep the blower access door in place
except for inspection and maintenance.
This furnace is also equipped with a self-diagnosing electronic
control module. In the event a furnace component is not operating
properly, the control module LED will flash on and off in a factory-
programmed sequence, depending on the problem encountered.
This light can be viewed through the observation window in the
blower access door. Refer to the Troubleshooting Chart for further
explanation of the lighting codes.
Follow the start-up and adjustment items, refer to further
information in Section XIII, Operational Checks (see table of
contents, pages 2-3 for page number)..
F
URNACE OPERATION
Purge gas lines of air prior to start-up. Do not purge lines into an
enclosed burner compartment.
22

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents