ProCurve 1800-8G Installation And Getting Started Manual page 17

Hewlett-packard switch installation & getting started guide
Hide thumbs Also See for ProCurve 1800-8G:
Table of Contents

Advertisement

2.
Check the LEDs on the switch. The LED behavior is described
below.
Power LED
When the switch is powered on, it performs its diagnostic self
test. The self test takes approximately 8 seconds to complete.
Self Test LED Behavior:
During the self test:
The LEDs will go on for a couple of seconds during the phases
of the self test.
When the self test completes successfully:
The Power LED stays on.
The Fault LED stays off.
In the default state, the FDx LED stays on and the Spd LED
stays off.
The port LEDs on the front of the switch go into their normal
operational mode.
If the ports are connected to active network devices the
Link LEDs should be on.
If the LED display is different than what is described above, the
self test has not completed correctly. Refer to chapter 4,
"Troubleshooting" for diagnostic help.
Installing the Switch
Installation Procedures
Port LEDs
2-7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1800-8g1810-8gJ9029a

Table of Contents