Empire Comfort Systems DVP36PP32EN-3 Series Installation Instructions And Owner's Manual page 59

The direct vent zero clearance gas fireplace heater
Hide thumbs Also See for DVP36PP32EN-3 Series:
Table of Contents

Advertisement

OPTIONAL BLOWER INSTALLATION INSTRUCTIONS (continued)
4.
Insert blower assembly into interior, bottom of fireplace.
Note: On peninsula models, the blower must be installed at
the end which has the brick panel installed. Position blower
assembly so that you align the notch on back of blower as-
sembly with the center screw on side/end panel, then push
the blower assembly against fireplace outer panel. The blower
wheel must be centered with the side/end wall of the fireplace.
The magnets on the back and bottom of blower assembly will
sufficiently hold blower assembly in place. See Figure 71.
5.
Once the blower assembly is in position, remove the upper
louver as shown and locate the switch tab (end of support
channel) on top of the firebox. Install the fan control switch
by first removing the two pre-installed screws in the tab, then
secure the fan control switch to the tab. See Figure 72. Once
the fan control has been secured, bend the tab forward so that
the face of the fan control is pushed down so it contacts the
firebox top.
6.
Next, find the fan control wire assembly. Feed the wires over
the top of the firebox. The fan control wires will slide down be-
tween the firebox and outer wrap near the blower assembly.
See Figure 71. Attach the two 3/16" wire terminals to the
fan control switch as shown in Figure 72. Attach the wire
terminals at the blower as shown by letters "A" and "B"
in Figure 75 on page 60.
WIRE ASSEMBLY
FROM FAN
CONTROL SWITCH
7.
Route the wires away from moving parts of the blower assem-
bly and retain wires together near the blower motor using the
plastic purse clip provided.
8.
To complete the installation, plug the power cord into the junc-
tion box receptacle previously installed in the bottom of the
fireplace. See Figures 70 and 71.
9.
Once all connections are made electrically, it is recommended
that you test the blower fan control operation by turning on
power to the blower (Caution: 110 Volt). Turn the fireplace on
and let run until blower is activated. This should take approxi-
mately 10 to 20 minutes from a cold start. Once blower is ac-
tivated, check for proper operation. Do not place hands near
blower assembly or other wiring while power is on.
30786-3-0614
FAN
CONTROL
SWITCH
Figure 71
10. Replace louver(s).
11. This completes the installation of the optional FBB5 Blower kit
accessory.
Note: This blower is equipped with a heat activated fan control
switch. Blower will operate when the fireplace warms up,
and will turn off automatically when the fireplace cools
down. The time will vary for the activation of the fan con-
trol switch depending on several factors including fireplace
type, BTU input variables, and log set style. Generally, it
may take from 10 to 20 minutes to activate blower/fan con-
trol from a cold start.
FAN CONTROL
SWITCH
Figure 72
USE OF A STANDARD
ON/OFF WALL SWITCH TO
OPERATE OPTIONAL BLOWER
Figure 73
Page 59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents