Concluding Steps - Fujitsu PRIMERGY TX120 S3 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY TX120 S3:
Table of Contents

Advertisement

Figure 234: Inserting the front panel cable into the cable clamp.
Ê Run the front panel cable through the cable clamp.

15.3.5 Concluding steps

Perform the following procedures to complete the task:
Ê Close the server cover as described in section
page
70.
Ê Reconnect the AC power cord to the power supply unit and secure it with a
cable tie as described in section
TX120 S3
"Switching on the server" on page
Upgrade and Maintenance Manual
"Closing the server" on
Cables
77.
379

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents