Battery Temperature Sensor (Optional); Moving The Battery Cabinets; Cable Entry; Figure 7 Single Temperature Sensor And Monitor Board-U2 - Liebert NX User Manual

Nx ups 10-30kva, 400v, 50/60hz
Hide thumbs Also See for NX:
Table of Contents

Advertisement

Battery Installation
2.3.6

Battery Temperature Sensor (Optional)

The optional external battery temperature sensor kit contains one probe and one temperature trans-
port board as illustrated in Figure 7. It is connected to the UPS Monitor Board.
Figure 7
Single temperature sensor and monitor board-U2
Name: W1 L=30m
Cable W2 is packed with the temperature sensor.
2.3.7

Moving the Battery Cabinets

WARNING
!
Ensure any lifting equipment used in moving the cabinet has sufficient lifting capacity.
Ensure that the weight is within the designated surface weight loading of any handling equipment.
See Table 8 for weight details.
Battery cabinets can be handled by means of a fork lift or similar equipment.
NOTE
Care must be taken when maneuvering units fitted with batteries. Keep such moves to a
minimum.
When the equipment has been finally positioned ensure the adjustable feet are set so that the
battery cabinet will remain stationary and stable.
Seismic anchors option is available for anchoring the unit to a concrete floor.
2.3.8

Cable Entry

Cables enter the battery cabinet from the bottom. Cable entry is made possible by removing a blank-
ing piece fitted at the bottom to reveal the cable entry hole.
Name: W2 L=5m
Temperature
Sensor
NC
+
12V
IN
OUT
-
GND
TMP-2
20
Monitor
Board
X7
– U2
-12V
BAT-T
GND
UPS

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents