The information contained in this document is subject to change without notice and may not be suitable for all applications. While every precaution has been taken to ensure the accuracy and completeness of this document, Vertiv assumes no responsibility and disclaims all liability for damages resulting from use of this information or for any errors or omissions.
Risk of moving heavy units and tipping hazard. Can cause equipment damage, injury and death. Exercise extreme care when handling cabinets to avoid equipment damage or injury to personnel. The Liebert NXL Maintenance Bypass Cabinet weighs up to 755 lb (342.5kg). Locate center of gravity symbols and determine unit weight before handling each cabinet.
Page 8
Operating this device in a residential area is likely to cause harmful interference that users must correct at their own expense. The Liebert NXL complies with the requirements of EMC Directive 2004/108/EC and the published technical standards. Continued compliance requires installation in accordance with these instructions and use of accessories approved by Vertiv.
NOTICE Three-phase input supply required. The standard Liebert NXL UPS is suitable for connection to three-phase, four-wire (+ Earth) TN-C, TN-S, IT-G, IT-IG or, three-phase, three-wire plus ground, IT-UG. If using with IT Power system, a 4-pole disconnect device must be included as part of building installation.
(see 3.0 - Specifications). All models of the Liebert NXL Maintenance Bypass Cabinet are convection-cooled. To permit air to enter and exit and prevent overheating or malfunctioning, do not cover the ventilation openings.
1.4.2 Clearances Liebert NXL Maintenance Bypass Cabinets have no ventilation grilles at either side or at the rear. Clearance around the front of the equipment should be sufficient to enable free passage of personnel with the doors fully opened.
The grounding cable connecting the UPS to the main ground system must follow the most direct route possible. • Consider using smaller, paralleled cables for heavy currents as a way of easing installation. Figure 1 Cabinet arrangement—Liebert NXL UPS, battery cabinets, Maintenance Bypass Cabinet Liebert If a maintenance bypass cabinet is used, it must be installed on the right side of the Liebert NXL UPS.
Page 13
If you have any difficulties, do not hesitate to contact Vertiv. See the back page of this manual for contact information. NOTE Proper grounding considerably reduces problems in systems caused by electromagnetic interference. ® ™ ™ | Liebert 250-500kVA Installation Manual | Vertiv...
Page 14
Connect the auxiliary cables of any external interface/signals to the respective connections of the output auxiliary terminal block (X4) (see 2.0 - Installation Drawings). 8. Replace interior panels and close door. ® ™ ™ Vertiv | Liebert 250-500kVA Installation Manual |...
Installation Drawings Figure 4 Liebert NXL two-breaker Maintenance Bypass Cabinet—250 and 300kVA main component location Input Output Phase C Phase C Input Output Phase A Phase A Breaker Not Shown Input Output Phase B Phase B Ground Neutral BUSBAR DETAIL B...
Installation Drawings Figure 5 Liebert NXL two-breaker Maintenance Bypass Cabinet—400kVA and 500kVA main component location Input Output Phase C Phase C Input Output Phase A Phase A Input Neutral Output Phase B Ground Phase B Breaker Not Shown Busbar Detail B...
2. Cables from upper busbars can be optionally tied also, as shown in top entry view. 3. The UPS output phase cables must be run on the left side of cabinet, outside of the ground bus. ® ™ ™ | Liebert 250-500kVA Installation Manual | Vertiv...
Installation Drawings Table 1 Vertiv-supplied interconnect wiring for Liebert NXL two-breaker Maintenance Bypass Cabinet From Conductor Utility AC - Phase A MBC Bypass AC - Phase A Maintenance Bypass AC - Phase A Utility AC - Phase B MBC Bypass AC - Phase B...
Installation Drawings Figure 14 Liebert NXL two-breaker Maintenance Bypass Cabinet control wire routing Conduit Knockouts For Control Wiring Internal Routing For Control Wiring Internal Rounting For Control Wiring Conduit Knockouts For Control Wiring FRONT VIEW SECTION A-A ® ™ ™...
Figure 15 Ground strap location for connected cabinets Reference of corner post of connected cabinets FRONT SIDE OF UNITS DETAIL A Cabinet-to-Cabinet Typical Ground Strap Installation Bolting Instructions (Use for all connected units except Battery Cabinet) ® ™ ™ | Liebert 250-500kVA Installation Manual | Vertiv...
(2) 3-350kcmil, #1/0AWG (2) 3-500kcmil, #1/0AWG Notes on Tables 7 through 12 See the Liebert NXL UPS installation manual, SL-25420, for UPS rectifier, UPS bypass and UPS output sizes. The manual is available at the Liebert Web site: www.liebert.com These are guidelines only and are superseded by local regulations and codes of practice where applicable.