Handle Installation
Install the right and left handles on the generator upper frame using
the brackets and 4 flange bolts.
TORQUE:
17 22 lbf·ft (24 29 N·m , 2.4 3.0 kgf·m)
−
8 16 mm FLANGE BOLT (4)
×
LEFT UPPER HANDLE ASSY
LEFT HANDLE BRACKET
−
−
RIGHT UPPER HANDLE ASSY
RIGHT HANDLE
BRACKET
57