Agency Compliance Specifications; Operating Environment Requirements; Electrical Power - Fujitsu SPARC Enterprise T5440 Site Planning Manual

Hide thumbs Also See for SPARC Enterprise T5440:
Table of Contents

Advertisement

Agency Compliance Specifications

Refer to the SPARC Enterprise T5440 Server Safety and Compliance Guide for a full list of

agency compliance specifications.

Operating Environment Requirements

Your environmental control system must provide intake air for the server that
complies with the limits specified in
To avoid overheating, do not direct warmed air:
Toward the front air intake of the server
Toward the server access panels
Note – When you receive your server, place it in the environment where you will
install it. Leave the server in its shipping crate at its final destination for 24 hours.
This resting period prevents thermal shock and condensation.
The servers have been tested to meet all functional requirements when operating in
the operating environmental limits presented in
page
increases the failure rate of hardware components. To minimize the chance of
component failure, use the server within the optimal temperature and humidity
ranges.

Electrical Power

Good practice is to connect each power supply to a separate circuit. This redundancy
enables the system to remain operational if one of the circuits fails. Consult your
local electrical codes for any additional requirements.
6
SPARC Enterprise T5440 Server Site Planning Guide • July 2009
3. Operating computer equipment in extremes of temperature or humidity
"Environmental Specifications" on page
"Environmental Specifications" on
3.

Advertisement

Table of Contents
loading

Table of Contents