< Note >
The slope of water drainage hose shall be within 75mm , make the drainage plug not to bear
excessive force.
If several water hoses join together, of as per following procedures.
Specifications of the selected drainage hoses shall meet the requirements for the unit running
6. Installation of Ornament Panel
Install ornament panel on indoor unit
(1) Check whether indoor unit is horizontal with leveler or polythene pipe filled with water , and
check that the dimension of the ceiling opening is correct. Take off the lever gauge before
installing the ornament panel.
(2) Fasten the screws to make the height difference between the two sides of indoor unit less than
5mm.
(3) Firstly fix it with screws temporarily.
(4) Fasten the two temporarily fixing screws and other two, and tighten the four screws.
(5) Connect the wires of synchro-motor.
(6) Connect the wire of signal.
(7) If no response of remote controller,check whether the wiring is correct,restart remote controller
10 seconds after shut off power supply.
Panel limitation board installation
(1)Install the panel board in the direction shown in the figure.
(2)The incorrect direction will result in water leakage,meanwhile swing and signal receiving are displayed
that cannot be connected.
Piping Connection
Flare connection
Indoor
Unit
15
Commercial Air Conditioner
Slope below 1/100
Electric control box
Gas pipe
Liquid
pipe
Connection drainage hose with a T-joint
3-way valve
Outdoor
unit
2-way valve
Flare connection
Model: AB182ACERA