Preparing to Mount the Projector
→ Refer to "Preparing to Mount the Projector"
(page 24) under "Wall Mounting Construction".
Mounting the Projector Arm
→ Refer to "Mounting the Projector Arm"
(page 26) under "Wall Mounting Construction".
Adjusting the Up/Down Unit
→ Refer to "Adjusting the Up/Down Unit"
(page 28) under "Wall Mounting Construction".
Mounting the elite Panaboard
→ Refer to "Mounting the elite Panaboard"
(page 33) under "Wall Mounting Construction".
Checking the Up/Down Operations
→ Refer to "Checking the Up/Down Operations"
(page 33) under "Wall Mounting Construction".
Wiring Connections
→ Refer to "Wiring Connections" (page 34) under
"Wall Mounting Construction".
Apply the High-Temperature
Warning Label
→ Refer to "Apply the High-Temperature Warning
Label" (page 34) under "Wall Mounting
Construction".
Projection Adjustments
→ Refer to "Projection Adjustments" (page 35)
under "Wall Mounting Construction".
Securing the elite Panaboard
→ Refer to "Securing the elite Panaboard"
(page 36) under "Wall Mounting Construction".
Attaching the Protective Cover
Attach the protective cover to the rear surface as
shown in the diagram below.
•
To mount the protective cover, pass the screws (:)
for securing the protective cover through the flat
washers (;) for securing the protective cover. Then
use the screws to secure the cover.
Protective
Cover
Securing the Up/Down Stand Kit
When using the system with the up/down stand kit, the
system may fall over if a child should hang or swing
from the projector arm, for example. After deciding
where the system will be used, to prevent tipping, drive
the anchors into the floor and secure the rear foot
reinforcing assemblies with M8 bolts before use.
1
Move the assembled up/down stand kit to the
place where the system will be used, and
decide on where it is to be anchored.
2
On the floor, mark off the hole positions made at
the centers of the rear foot reinforcing assemblies,
and move the up/down stand kit aside.
3
Drill two holes in the floor using a drill.
4
Secure the anchors in the holes.
5
Return the up/down stand kit to where it is to be
anchored, and secure the rear foot reinforcing
assemblies using the M8 bolts with flat washers
and spring washers attached to them.
Note
•
The specified pull-out strength is required
per anchor.
M8 anchor bolts are used.
Specified pull-out strength: 5,197.5 N (530 kgf)
•
When the floor is not concrete, reinforce the floor
so that it can support the up/down stand kit.
Checking the Operations of the
elite Panaboard
For details of cleaning the screen and checking the
operations of the elite Panaboard, refer to the
Operating Instructions of the elite Panaboard.
Assembling the Stands
Installation Manual
39