Henny Penny 6 Installation Manual
Henny Penny 6 Installation Manual

Henny Penny 6 Installation Manual

Climaplus combis

Advertisement

Quick Links

Fig. 1
Fig. 2
59
Installation
Refer to the following pages for important information regarding the
installation of LCS and LCG ClimaPlus Combis. It is recommended
that installation be accomplished by a certified and properly trained
technician.
NOTE: When installing a ClimaPlus combi, humidity calibration must
be performed. This process takes approximately 45-60 minutes. (page 62)
Site, leveling
1) Check for any transport damages. Should there be any signs of transport
damage immediately inform your dealer/freight forwarder.
2) Check installation site. Check entrance clearance.
Minimum entrance space needed without pallet:
Model 6 & 10:
Model 1020:
Model 20:
Model 40:
Floor at installation site must be level.
Cold water line in place. (page 63)
2 in. (50 mm) drain connection installed.
Max. drain height for floor units: 4 in. (100mm)
Electrical power supply/protective measures installed and sized correctly.
(page 60-61)
3) Remove all cartons, packing materials, documents etc. from the interior cabinet.
4) Remove grid shelves/trolley from cabinet.
5) Take unit off the pallet.
Moving unit without pallet: Sizes 6, 10, 1020 (Fig. 1)
Moving unit without pallet: Sizes 20, 40 (Fig. 2)
Minimum clearance sides and back:
2 in. (50 mm)
Service clearance, left side:
20 in. (500 mm)
Clearance for door opening:
Model 6 & 10:
20
Model 1020:
29
Model 20:
28
Model 40:
30
35
1
in. (902 mm)
2
49
in. (1262 mm)
5
8
39
7
in. (1012 mm)
8
52
1
in. (1332 mm)
2
1
in. (521 mm)
2
1
in. (749 mm)
2
3
in. (730 mm)
4
3
in. (781 mm)
4

Advertisement

Table of Contents
loading

Summary of Contents for Henny Penny 6

  • Page 1 Max. drain height for floor units: 4 in. (100mm) Electrical power supply/protective measures installed and sized correctly. (page 60-61) Moving unit without pallet: Sizes 6, 10, 1020 (Fig. 1) Moving unit without pallet: Sizes 20, 40 (Fig. 2) ⁄ in. (521 mm) ⁄...
  • Page 2: Unit Weights

    Unit must be level (Fig. 5). The unit must be secured against shifting on the floor by means of floor fixtures (Fig. 6). If floor fixtures are glued to the floor (use polyurethane glue or similar), remove all grease from the floor first.
  • Page 3 Common tap 208 volt tap IMPORTANT Fig. 11 In some areas Henny Penny Electric Combis are shipped set up for 240 volts, but can be converted to 208 volt operation. If conversion is necessary the unit must be Jumper wire reset and calibrated.
  • Page 4: Humidity Calibration

    Model Terminal Positions LCG-6 5 and 6 LCG-10 5 and 6 LCG-1020 5 and 6 LCG-20 6 and 7 LCG-40 5 and 6 Once conversion has been completed, a “total reset” of the CPU-PCB must be done. Record all end-user (custom) programs before undertaking a Total Reset.
  • Page 5 WZ1 WZ2 Optional Treated Water Connection NOTE: If using external filter to treat hard water: Contact your Henny Penny distributor for average water consumption when using CleanJet. Increases in average water consumption may exceed specifications of external filters and may affect the frequency of filter maintenance.
  • Page 6: Gas Supply

    Model LCG-6 LCG-10 LCG-1020 LCG-20 LCG-40 3.17 gal/hr (0.2 l/min.) 6.7 gal/hr (0.42 l/min.) 10.9 gal/hr (.069 l/min.) 13.2 gal/hr (0.83 l/min.) 15.8 gal/hr (1.0 l/min.) Latent Sensible .64 W (2.30 kJ)/hr 84 W (2.93 kJ)/hr 1.05 W (8.50 kJ)/hr 1.4 W (5.00 kJ)/hr...
  • Page 7 Gas pressure All Henny Penny Combi-Steamers are equipped with two heat exchanger systems. One is responsible for steam production, the second for dry heat. Each individual heat exchanger is heated with a separate burner assembly.
  • Page 8 INSTALLATION During pressure testing note the following: continued 1. The unit and its individual shut-off valves must be disconnected from the gas supply piping system during any pressure testing of that system when test pressures exceed gas supply line. 2. The unit must be isolated from the gas supply piping system by closing its individual manual shut-off valves during any pressure testing of the gas supply piping system at test pressure equal to or less than 3.
  • Page 9: Cable Restraint

    Secure eye-bolt to a framing stud. DO NOT attach to dry wall only. Locate eye-bolt at the same height as the gas service approximately 6 in. (150 mm) to either side of service. Cable restraint must be at least 6 in. (150 mm) shorter than flexible gas line.

Table of Contents