Hot Or Cold Top On A Cold Base Installation Instructions - Henny Penny CBC/CBR-103 Operator's Manual

Cold bases
Hide thumbs Also See for HENNY PENNY CBC/CBR-103:
Table of Contents

Advertisement

2-10. HOT or COLD TOP ON A
COLD BASE INSTALLA-
TION INSTRUCTIONS
Figure 2-1
Figure 2-2
Figure 2-3
2-6
1. Remove bolts securing the top to the skid, and save bolts
for later use.
2. Carefully set top on top of the cold base.
Take care when moving the unit to prevent personal
injury or damage to the refrigeration system. The units
weigh between 400 (181 kg) and 580 lbs. (263 kg).
3. Line up the 2 front holes and secure the top to the base using
the bolts from step 1. Figure 2-1.
4. Locate mounting hole in right, rear corner of the units and se-
cure the corner using one of the bolts from step 1. Figure 2-2.
5. Pull the control panel out from unit and locate the mounting hole
in the left, rear corner. Secure corner with one of the screws
from step 1. Figure 2-3.
6. Installation is now complete.
Model CBC/CBR-103,104,105,106,107
303

Advertisement

Table of Contents
loading

Table of Contents