Follett HMF1400R Operation And Service Manual page 21

Hcd/hmd/hcf/hmf1400r, hcd/hmd1400n ice machines
Table of Contents

Advertisement

11. Reconnect transport tube to louvered docking assembly.
12. Plug sensor in at the electrical box.
13. Reconnect vent tube to the shuttle housing as shown.
14. Apply a coat of petrol-gel to the auger shaft.
15. Install gearmotor, making sure that insulation is properly
seated between gearmotor and main housing as shown.
16. Firmly tighten four gearmotor bolts in place.
14. Insert a bolt into the auger shaft and fi nger tighten.
15. Using a wrench, rotate the shaft clockwise to align the
keyways in the gear housing and the shaft so as to
accept the key.
16. Insert the key into the keyway.
Horizon 1400R/N Ice Machines
Fig. 22
Fig. 23
Apply
petrol-gel
Fig. 24
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hmd1400nHmd1400rHcf1400rHcd1400rHcd1400nC33984

Table of Contents