TRENDnet TE100-S16 User Manual page 3

16-port 10/100mbps fast ethernet switch
Hide thumbs Also See for TE100-S16:
Table of Contents

Advertisement

b) Reduced Air Flow- Installation of the equipment in a rack should
be such that the amount of air flow required for safe operation of the
equipment is not compromised.
c) Mechanical Loading-Mounting of the equipment in the rack should
be such that a hazardous condition is not achieved due to uneven
mechanical loading.
d) Circuit Overloading- Consideration should be given to the
connection of the equipment to the supply circuit and the effect that
overloading of circuits might have on over current protection and
supply wiring. Appropriate consideration of equipment nameplate
ratings should be used when addressing this concern.
e) Reliable Earthing-Reliable earthing of rack-mounted equipment
should be maintained. Particular attention should be given to supply
connections other than direct connections to the branch circuit (e.g.,
use of power strips).
P/N :1907ESW16D15000

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents