Upper Chute Installation; Chute/Hood Installation; Leveling The Mower Deck - Husqvarna MZ54 Operator's Manual

Hide thumbs Also See for MZ54:
Table of Contents

Advertisement

7

UPPER CHUTE INSTALLATION

1. Attach bungee latch assembly from kit.
2. Slide upper chute onto lower chute, lining up
notches and channels.
3. Stretch bungee latch up onto acorn nut on upper
chute to secure.
8
ASSEMBLY
8
CHUTE / HOOD INSTALLATION
1. Push the upper chute through the gasketed
opening in the cover assembly.
2. Rotate the chute so the chute opening is
downwards toward the container bags.
9

LEVELING THE MOWER DECK

For the best mower performance, the deck should
be properly leveled. Refer to the Operator Manual for
instructions.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents