Download Print this page

Installation - GE GTDL310EM2WS Installation Instructions Manual

Advertisement

Installation
1. Turn
off the circuit
breaker
(s) (30 amp)
or remox e tlle chTer's
circuit
fuse at the electrical
box.
2. Be sure the chTer cord
is unplugged
from
tile wall receptacle.
3. Remox e tile power
cord
coxer
located
at the lower
back.
4. Remox e and discard
ground
strap.
Keep
tlle green
ground
screw for step
7.
5. Install
3/4 in. LL recognized
strain
relief
to power
cord
entl T hole.
Bring
power
cord
through
strain
relief.
6. Comlect
power
cord
as follows:
A. Comlect
the 2 hot lines
to tile outer
screws of
tlle terminal
block
(marked
L1 and L2).
B. Connect
tlle neutral
(white)
line
to tile center
of
tile terminal
block
(marked
N).
7. Attach
ground
wire of power
cord
with tile green
ground
screw
(hole
aboxe
strain
relief
bracket).
Tighten
all
terminal
block
screws
(3) completely.
8. Properly
secure
power
cord
to strain
relief.
9. Reinstall
tile co_ er.
_ILWARNING:
NEVER LEAVE THE
COVER OFF OF THE TERMINAL BLOCK,
CONNECTING
DRYER USING 3-WIRE
CONNECTION
IFREQUIRED,
BYLOCAL C ODE,
INSTALL EXTERNAL GROUND
(NOTPROVIDED)
TOGROUNDED
METAL, COLD WATER PIPE, OR
OTHER E STABLISHED
GROUND
DETERMINED
BYA QUALIFIED
ELECTRICIAN.
GREEN
GROUND
GROUND STRAP
SCREW
HOT
WIRE
STRAIN RELIEF
BRACKET
_
3/4", UL
RECOGNIZED
RELIEF
NEUTRAL
HOT
(White)
WIRE
3 #10AWGMINIMUMCOPPER
COVER
CONDUCTORS O R120/240V 30APOWER
SUPPLY CORD KITMARKED FOR USE
WITHDRYERS & PROVIDED W ITHCLOSED
LOOP ORSPADE TERMINALS WITH
UPTURNED E NDS (NOTSUPPLIED).
1. Tm'n off tile circuit
breaker(s)
(30 amp)
or remo_ e tile chTer's
circuit
fuse at the electrical
box.
2. Be sure
the chTer
cord
is unplugged
Kom
the wall.
3. Remoxe
the power
cord
coxer
located
at tile lower back.
4. Install
3/4 in. LL
recognized
strain
relief
to power
cord
entQ:
bole.
Bring
power
cord
through
strain
relief.
5. Connect
power
cord
as follows:
A. Com_ect
the 2 hot lines to the outer
screws
of tile
terminal
block
(marked
L1 and L2).
B. Com_ect
the neutral
{white)
line to tile center
of
the terminal
block
{marked
N).
6. Be sure grotmd
strap
is connected
to neutral
(center)
terminal
of block
and to green
ground
screw
on cabinet
rear.
Tighten
all terminal
block
screws
(3) completely.
7. Properly
secure
power
cord
to strain
relief.
8. Reinstall
tile co_ er.
A
,AHb_WARNING: NEVER LEAVE THE
COVER OFF OF THE TERMINAL BLOCK.
Instructions
EXHAUST
INFORMATION
_WARNING
- IN CANADA AND IN THE UNITED
STATES, THE REQUIRED
EXHAUST DUCT DIAMETER
IS 4 IN (102ram).
DO NOT USE DUCT LONGER
THAN SPECIFIED IN THE EXHAUST LENGTH TABLE.
Lsing
exhaust
longer
than
specified
length
wilh
" Increase
the drying
times
and
tile energ T cost.
, Reduce
the chTer life.
, Accumulate
lint, creating
a potential
fire hazard.
The correct
exhaust
installation
is YOUR
RESPONSIBILITY.
Problems
due to incorrect
installation
are not covered
by the warranty.
Remove
and discard
existing
plastic
or metal
foil transition
duct
and replace
with LL listed
transition
duct.
The MAXIML
M ALLOWABLE
duct
length
and number
of
bends
of the exhaust
system
depends
upon
the type of duct,
number
of turns,
the
type of exhaust
hood
(wall cap),
and all
conditions
noted
below.
The maximum
duct length
for rigid
metal
duct is shown
in the table
below.
EXHAUST
LENGTH
RECOMMENDED
MAXIMUM
LENGTH
Exhaust Hood Types
Recommended
Use only for short
run installations
/
_
4"
DIA
I
_2-I/2"
No. of 90-0
Rigid
Rigid
Elbows
Metal
Metal
0
150 Feet
125 Feet
1
135 Feet
115 Feet
2
125 Feet
105 Feet
3
115 Feet
95 Feet
4
105 Feet
85 Feet
5
95 Feet
75 Feet
EXHAUST
SYSTEM
CHECK LIST
HOOD
OR WALL (AP
• Terminate
in a manner
to prevent back drafts or entry of birds or
other wildlife.
• Termination
should present
minimal
resistance
to the exhaust
air flow
and should require
little or no maintenance
to prevent
clogging.
• Never install a screen in or over the exhaust duct.This could cause lint build up.
Wall caps llltlst be installed
at least 12 in. above ground
level or any other
obstruction
with the opening
pointed
down.
SEPARATION
OF TURNS
For best perfermance,
separate
all turns by at least 4 ft. of straight
duct,
including
distance
between
last ttHn and exhaust
hood.
TURNS
OTHER
THAN 9!)°
• Oile ttlrn of 45 ° or less may be ignored.
• Two 45 °
ttwns
should be treated
as one 90 °
ttwn.
• Each ttlrn over 45 ° should be treated
as one 90 ° ttHn.
SEALING
OF JOINTS
• All joints
should be tight to avoid leaks. The male end of each section of
duct must point away flom the dryer.,
• Do not assemble
the ductwork
with fasteners
that extend into the duct.
They will serve as a collection
point fer lint.
• Duct joints
can be made air and moisture-tight
by wrapping
the
overlapped
joints with duct tape.
1
• Horizontal
runs should slope down toward the outdoors
½ inch per feot
INSULATION
Duct work that runs through
an unheated
area or is near air conditioning
should
be insulated
to reduce condensation
and lint build-up.

Advertisement

loading

This manual is also suitable for:

Gtdl200em2wwGtdl200em0wwDslvr48eh4wwDlsr483eg7wwGtdl310em0ws