Battery Installation; Preparation Before Start-Up - Generac Power Systems Guardian 004988-1 Owner's Manual

Liquid-cooled, prepackaged standby generators
Table of Contents

Advertisement

2.10 BATTERY INSTALLATION

DANGER
Standby generators installed with automatic
!
transfer switches will crank and start automati-
cally when NORMAL (UTILITY) source voltage is
removed or is below an acceptable preset level.
To prevent such automatic start-up and possible
injury to personnel, do not connect battery
cables until certain that normal source voltage
at the transfer switch is correct and the system
is ready to be placed into operation.
Storage batteries give off explosive hydrogen
gas. This gas can form an explosive mixture
around the battery for several hours after
charging. The slightest spark can ignite the gas
and cause an explosion. Such an explosion can
shatter the battery and cause blindness or
other injury. Any area that houses a storage
battery must be properly ventilated. Do not
allow smoking, open flame, sparks or any spark
producing tools or equipment near the battery.
Battery electrolyte fluid is an extremely caustic
!
sulfuric acid solution that can cause severe
burns. Do not permit fluid to contact eyes, skin,
clothing, painted surfaces, etc. Wear protective
goggles, protective clothing and gloves when
handling a battery. If fluid is spilled, flush the
affected area immediately with clear water.
Spilled electrolyte is to be washed down with
!
an acid neutralizing agent. A common practice
is to use a solution of one pound (500 grams)
bicarbonate of soda to one gallon (4 liters) of
water. The bicarbonate of soda solution is to be
added until the evidence of reaction (foaming)
has ceased. The resulting liquid is to be flushed
with water and the area dried.
Do not dispose of the battery in a fire. The
battery is capable of exploding.
Do not open or mutilate the battery. Released
!
electrolyte can be toxic and harmful to the skin
and eyes.
The battery represents a risk of high short circuit
current. When working on the battery, always
remove watches, rings or other metal objects,
and only use tools that have insulated handles.
When replacing batteries, use the same number and
type of battery. The recommended batteries are
Group 26, 12V negative ground 525 CCA/75 AH min-
imum capacity, or Group 27F , 12V negative ground
600 CCA/90 AH minimum capacity. All batteries
must be at 100 percent state-of-charge before they
are installed on the generator.
Guardian Liquid-cooled 27 kW and 30 kW Generators
When using maintenance-free batteries, it is not nec-
essary to check the specific gravity or electrolyte level.
Have these procedures performed at the intervals
specified in Section 4, "Maintenance." A negative
ground system is used. Battery connections are
shown on the wiring diagrams. Make sure all batter-
ies are correctly connected and terminals are tight.
Observe battery polarity when connecting batteries to
the generator set.
Damage will result if the battery connections are
made in reverse.

2.11 PREPARATION BEFORE START-UP

The instructions in this section assume that the
standby generator has been properly installed, serv-
iced, tested, adjusted and otherwise prepared for use
by a competent, qualified installation contractor. Be
sure to read the "Safety Rules" on Pages 2 and 3, as
well as all other safety information in this manual,
before attempting to operate this (and related) equip-
ment.
2.11.1 PRIOR TO INITIAL START-UP
!
Before starting the generator for the first time, the
installer must complete the following procedures. For
follow-up maintenance information and/or service
intervals, please refer to Section 4, "Maintenance."
2.11.2 TRANSFER SWITCH
If this generator is used to supply power to any elec-
trical system normally powered by an electric utility,
the National Electrical Code requires that a transfer
switch be installed. The transfer switch prevents elec-
trical backfeed between two different electrical sys-
tems (for additional information, see the applicable
transfer switch manual for this unit). The transfer
switch, as well as the generator and other standby
components, must be properly located and mounted
in strict compliance with applicable codes, standards
and regulations.
2.11.3 FUEL SYSTEM
Make sure the fuel supply system to the generator (a)
delivers the correct fuel at the correct pressure and
(b) is properly purged and leak tested according to
code.
"Specifications" (Section 1.10) for more information.
Section 2 — Installation
NOTE:
Prior to initially starting the generator, it must
be properly prepared for use. Any attempt to
crank or start the engine before it has been
properly serviced with the recommended types
and quantities of engine fluids (oil, coolant,
fuel, etc.) may result in an engine failure.
No
fuel
leakage
Generac
®
Power Systems, Inc. 11
is
permitted.
See