Installing The Transportable Battery Backup Unit (Tbbu) On Perc 6/E - Dell 6 series User Manual

Poweredge expandable raid controller
Table of Contents

Advertisement

Installing the Transportable Battery Backup
Unit (TBBU) on PERC 6/E
CAUTION:
Electrostatic Discharge (ESD)-safe workstation to meet the requirements of
EIA-625 – "Requirements For Handling Electrostatic Discharge Sensitive Devices."
The following procedure must be performed following the IPC-A-610 latest
revision ESD recommended practices.
CAUTION:
container or packaging.
CAUTION:
antistatic floor pads and work bench pads.
1 Unpack the TBBU and follow all antistatic procedures.
2 Remove the DIMM from the controller. Insert one end of the battery pack
harness (the red, white, yellow, and green wires) in the connector on the
memory module and the other end in the connector on the battery.
3 Place the top edge of the battery over the top edge of the memory module
so that the arms on the side of the battery fit in their sockets on the
memory module. For more information, see Figure 4-5.
Figure 4-5. Installing a TBBU
1
battery
2
connector on the battery
3
battery pack harness
46
Installing and Configuring Hardware
The following procedure must be performed at an
When transporting a sensitive component, first place it in an antistatic
Handle all sensitive components in a static-safe area. If possible, use
5
4
2
3
4
connector on the memory module
5
memory module
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Poweredge perc 6/iPoweredge perc 6/e

Table of Contents