Step 4. Attach Counterweight (Cw) Shaft; Step 5. Connect Cables; Step 6. Setup Hand Controller - iOptron SmartStar iEQ45 Instruction Manual

German equatorial mount with go2nova 8407 hand controller
Hide thumbs Also See for SmartStar iEQ45:
Table of Contents

Advertisement

3.2.4. STEP 4. Attach Counterweight (CW) Shaft

Unscrew the CW shaft from the top of the mount as shown in Figure 10(a) and thread it into the
opening of the DEC axis as shown in Figure 10(b).

3.2.5. STEP 5. Connect Cables

Attach one end of an RJ11 cable into the socket on the side of the DEC unit and the other end into
the DEC socket located on the main control unit. Using another RJ11 cable, connect the hand controller and
the HBX socket located on the main control unit. Plug the 12V DC power supply into the Power socket on
the main control unit. The red LED will illuminate when the power switch is turned on.

3.2.6. STEP 6. Setup Hand Controller

The iEQ45 is equipped with a GPS receiver, which will receive the time, longitude and latitude
information from satellites after the link is established. A clear sky outside is needed for the GPS to
establish its link with the satellites and change the display form GPS ON to GPS OK. Remove the OTA if it
takes longer than expected to be connected to satellites.
Press MENU button, from the main menu, scroll down and select "Set Up Controller"
Select and Slew
Sync. to Target
Set Up Controller
Align
PEC Option
Set Tracking Rate
Set User Objects
Guide Options
Press ENTER and select "Set Up Time and Site"
Set Up Time and Site
Set Display and Beep
Set Anti-backlash
Meridian Treatment
Set Eyepiece Light
Heating Controller
Upgrade R.A. and DEC
Firmware Information
(a)
Figure 10
14
(b)

Advertisement

Table of Contents
loading

Table of Contents