Engine Assembly - Mitsubishi 4G6 Manual

Hide thumbs Also See for 4G6:
Table of Contents

Advertisement

11B-30

ENGINE ASSEMBLY

REMOVAL AND INSTALLATION
Pre-removal Operation
D
Fuel Discharge Prevention (Refer to GROUP 13A
- On-vehicle Service.)
D
Under Cover Removal
D
Hood Removal (Refer to GROUP 42.)
D
Air Cleaner Removal
D
Radiator Removal (Refer to GROUP 14.)
D
Front Exhaust Pipe Removal (Refer to GROUP 15.)
D
Engine Cover Removal
D
Battery Removal
D
Engine Coolant Draining
1
O-ring
19
Engine oil
Removal steps
1. Accelerator cable connection
2. Capacitor connector
3. Vacuum hose connection
4. TPS connector
5. Accelerator pedal position sensor
connector <TCL>
6. ISC connector
7. Control harness connector
8. Distributor connector
9. Vacuum hose connection
10. Engine coolant temperature sensor
connector
11. Engine coolant temperature gauge
unit connector
12. Injector connector
ENGINE <6A1> -
18 Nm
3
17
2
23
24
16
9
Engine Assembly
Post-installation Operation
D
Front Exhaust Pipe Installation (Refer to GROUP
15.)
D
Radiator Installation (Refer to GROUP 14.)
D
Air Cleaner Installation
D
Hood Installation (Refer to GROUP 42.)
D
Under Cover Installation
D
Drive Belt Tension Adjustment (Refer to P.11B-5.)
D
Accelerator Cable Adjustment (Refer to GROUP
17 - On-vehicle Service.)
D
Engine Cover Installation
D
Battery Installation
D
Engine Coolant Supplying
5 6
7
4
8
9
10
12
14
15
13
13. Power steering oil pressure switch
connector
14. Oil pressure harness connector
15. Thermo switch connector
16. Crank angle sensor connector
17. Brake booster vacuum hose con-
nection
18. Fuel return hose connection
"DA 19. High-pressure fuel hose connection
20. Earth cable connection
21. Control harness connector
22. Front harness connector
23. Purge control solenoid valve
connector
24. EGR solenoid valve connector
18
19
20
11
22
11200100558
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

6a14d6

Table of Contents