Yamaha MAJESTY 400 Owner's Manual page 50

Hide thumbs Also See for MAJESTY 400:
Table of Contents

Advertisement

PERIODIC MAINTENANCE AND MINOR REPAIR
1
2
3
2. Install the screw access cover by
placing it in its original position.
4
3. Install the grab bar by installing the
collars and grab bar bolts.
5
Tightening torque:
Grab bar bolt:
6
23 Nm (2.3 m·kgf, 16.6 ft·lbf)
7
4. Install the passenger seat.
5. Install cowlings A and B.
Cowling E
8
To remove the cowling
1. Pull up the left floorboard mats as
9
shown.
1
1. Left floorboard mat
2. Remove the cowling screws.
1
(×4)
1. Screw
3. Pull the cowling down slightly, and
then pull it outward as shown.
6-8
1
1. Cowling E
To install the cowling
1.Insert the tabs on the cowling into
the slots as shown, and then install
the screws.
1
1
(×13)
1. Tab
2. Place the left floorboard mats in
the original position.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Majesty yp400

Table of Contents