Installation; Overview; Preliminary Checks; Table 2-1 Preliminary Checks - Honeywell UDC 2300 User Manual

Universal digital controller
Hide thumbs Also See for UDC 2300:
Table of Contents

Advertisement

2.1 Overview

Introduction
Installation of the UDC 2300 consists of mounting and wiring the controller
according to the instructions given in this section. Read the pre-installation
information, check the model number interpretation (Appendix B), and become
familiar with your model selections, then proceed with installation.

2.2 Preliminary Checks

Introduction
Before you install the controller, remove the chassis and make any preliminary
checks necessary that are listed in Table 2-1. Figure 2-1 shows the locations for
jumper placements.
Check
Preliminary Check
Number
1
Input I Jumper Placement
Optional Input 2 (RSP)
2
Jumper Placement
Control Relay 1 and Current
3
Output
4/00

2 Installation

Table 2-1 Preliminary Checks

Check the internal jumper for INPUT 1 to make
sure it is set for the correct input type. The jumper
is located at position S101 on the printed wiring
board. Figure 2-1 shows the location of the jumper
and position selections.
Check the internal jumper for INPUT 2 to make
sure it is set for the correct input type. The jumper
is located at position S201 on the printed wiring
board. Figure 2-1 shows the location of the jumper
and position selections.
Check the internal jumper (W101) for CONTROL.
The relay is shipped as N.O. (Normally Open).
Figure 2-1 shows the location of the jumper and
position selections.
See Table 2-2 for Control Relay contact
information.
UDC2300 Universal Digital Controller User Manual
Installation
Description
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents