Step 1, Remove Packaging; Step 2, Install Water Line - GE Monogram ZIC360N LH Design Manual

Built-in bottom-freezer refrigerators with installation instructions
Hide thumbs Also See for GE Monogram ZIC360N LH:
Table of Contents

Advertisement

Installation
Instructions
[STEP 1] REMOVE
PACKAGING
CAUTIO N:
Refrigerator
is much
hea, ier at the
top than at the botton/-
be careflll
when
moxing.
X,_ hen
usim* a hand
track,
handle
fl'om side onE.
PRUDENCE: Ce
est
pl.s
hmrd
en haut
qu'en
bas. I1 taut 6tre prudent
lots des
d@lacements.
Si un diable
est utilis& il taut soulexer
le
r_frig&'ateur
stu" le c6t_ seulement.
• Careflflly
cut banding
at the top and bottom,
relilove
otKer carton.
• Slide out back
corner
posts
(2).
• Slide carton
ott top of cabinet.
NOTE:
IT IS NOT
NECESSARY
TO I,AY CABINET
DOWN
IN ORDER
TO P,EMOVE
SKID!
• The
trait is secured
to the skid with 4 slotted
tie-down
straps.
Remove
the tOtu" 5/16"
bolts fl'om
the base channels
in the tie-downs.
J
• Remoxe
the four
7/16"
bolts
secm'ing
the straps
to the skid.
CAUTION: DO NOT
ATTEMPT
TO ROI,I,
UNIT
OFF SKID.
Remove
Tie-Downs
/
PRUDENCE: ICNE
FAUT PAS ESSAYER
DE
FAIRE ROUI,ER
I,E
Rt_FI)d Gt_RATEUI).
POUR
I/ENI,EVER
DE lAY
PA1,ETTE.
• Sui)port
blocks
on the bottom
of the refligeration
case must
be removed
before
the refl'igerator
is
taken
off the skid or damage
will occm'. Careflfll>
tilt refligerator
and slide blocks
out from
beneath.
• Remove
toekick.
Set aside
for final installation.
• I,ilt the refligerator
off the skid with an appliance
dolly. Handle
fl'om
the sides.
[STEP 2] INSTALL WATER LINE
• A cold water
suI)ply is required
fin" automatic
icemaker
operation.
The water
pressure
must
be
between
40 and
120 p.s.i.
• Route
l/4"
OD COl)per or GE Smart(:onnect
'_
plastic
tubing
between
house
cold water
line and
the water connection
location.
• Tubing
should
be hmg
enough
to extend
to the
fl'ont
of the refl'igeratm:
Allow enough
tubing
to
accommodate
bend
leading
into the water line
connection.
NOTE:
The
only GE approved
plastic
tubing
is
sui)plied
in the GE Smart(:onnect
'_ Refl'igerator
Tubing
kits. Do not use any other
plastic
water sui)ply
line because
the line is trader
pressure
at all times.
Other
types of plastic
may crack
or Hq)ttu'e
with age
and
catlse water
dalllage
to
voui"
hollle.
GE Smart(]onnect
''_ Refl'igerator
Tubing
Fdts are
available
in the following
lengths:
2' (.6 m)
WX08X10002
6' (1.8 m)
WX08X10006
15' (4.6m)
WX08X10015
25' (7.6 m)
_,\_X08X10025
Shut
off
the
main
water
supply,
Turn
on the
nearest
fimcet
long
enough
to clear
the
line
of water.
• Install
a shut-off
\_d\'e
between
the
icemaker
water
valve
and
cold
water
pipe
in a basement
or cabinet.
The
shut-off
\Mve
should
be located
where
it will
be
easily
accessible,
_Copper Tubing
Compression Nut
SaddleType
ShutoffValve
Packing
Outlet Valve
Ferrule
(Sleeve)
NOTE:
It is best to install
the valve into
a vertical
water pipe.
If wm install
the valve into a horizontal
water pipe,
make
the connection
at the top or
side to avoid drawing
off any sediment
fl'om the
water pipe.
• Drill a 1/4"
hole in the water
pipe,
• Fasten
the shut-off
wdve to the pipe with pipe
clamp.
• Tighten
the clamp
screws
tmtil the sealing
washer
begins
to swell. Do not overtighten.
• Place a compression
nut and terlule
(sleeve)
onto
the end
of the tubing
and connect
it to
the shut-off
wdve, Make
sm'e the tubing
is fiflly
inserted
into
the wflve and terrule
is tightened,
10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents