Installation; Required Clearances - GE JBP79 Installation Instructions Manual

General electric self cleaning free-standing electric range installation instructions
Hide thumbs Also See for JBP79:
Table of Contents

Advertisement

Installation Instructions
Installation
Required Clearances
See Ilustrations
below
for all rough-in and spacing
dimensions.
The range may be placed with 0" clearance
(flush) at
the back wall and side walls of the cabinet.
MINIMUM
DIMENSIONS
BETWEEN
COOKTOP,
WALLS,
AND ABOVE THE
COOKTOP.
Make sure the wall covering,
countertop
and cabinets
around the range can with-
stand the heat (up to 200°R)
generated
by
the range.
Allow 30" Minimum
clearance
between
surface units and bottom of unprotected
wood or metal cabinet,
and 15" Minimum
between countertop
and adjacent
cabinet
bottom.
Recommended
spacing
to heat sensitive
surfaces.
Acceptable
electrical
outlet area.
Orient the electrical
receptacle
so the
length is parallel to the floor.
t
*'15" MIN
*0'_
J
1
J ....................................................................................
NOTE:
Use a 4 foot
power
cord to prevent
interference
with the storage
drawer.
Power
cords
4.5 or 6 foot
long
may have to be dressed
to allow for proper
drawer
closing.
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents