Fixing The Outdoor Unit In Place; Final Check And Trial Operation - Samsung AQV09J Series Installation Manual

Split-type air conditioner
Hide thumbs Also See for AQV09J Series:
Table of Contents

Advertisement

C
I
OMPLETING THE
NSTALLATION

Fixing the Outdoor Unit in Place

" X "
Rubber leg
Model
"X"
AQV09J
1.77ft(538mm) 0.95ft(290mm)
AQV12J
AQV18J
2.17ft(660mm) 1.12ft(340mm)
AQV24J

Final Check and Trial Operation

16
E-
Install the outdoor unit to a stable base to avoid the generation of noise and
vibration, especially when installing the unit close to a neighbor.
If you install the outdoor unit in a place exposed to strong winds or at a height,
fix it to an appropriate support (wall or ground).
1
Place the outdoor unit as indicated on the top of the unit to let the
discharged air out properly.
2
Fix the outdoor unit to an appropriate support using anchor bolts.
3
If the outdoor unit is exposed to strong winds, install shield plates around the
outdoor unit so that the fan can operate correctly.
"Y"
 Secure the rubber leg to prevent the generation of noise and vibration.
To complete the installation, perform the following checks and tests to ensure
that the air conditioner operates correctly.
1
Check the following:
Strength of the installation site
Tightness of pipe connection to detect gas leak
Electric wiring connection
Heat-resistant insulation of the pipe
Drainage
Grounding conductor connection
Correct operation (follow the steps below)
2
Press the
The indicator on the indoor unit lights up.
The airflow blade opens and the fan gears up for operation.
3
Press any button and check the following:
 T he appropriate indicator lights up and the air conditioner operates
according to the selected mode or function.
4
Press the
The airflow blades work properly.
button and check the following:
button and check the following:

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents