Heat & Glo VIENNA-I Installer's Manual page 23

Direct vent gas stove
Table of Contents

Advertisement

Installing the Stove
V
1
H
1
V
Figure 10. Vent System with three 90° elbows
(continued)
H
V
1
H
Installation
(suite)
VENTING WITH THREE (3) 90
(VENTILATION AVEC TROIS (3) COUDES À 90°)
V
2' MIN.(610mm)
3' MIN.(914mm)
4' MIN.(1.2m)
18' MIN.(5.4m)
V+ V
+H+H
1
H+ H
V
H
1
VENTING WITH THREE (3) 90
(VENTILATION AVEC TROIS (3) COUDES À 90°)
V
2' MIN.(610mm)
3' MIN.(914mm)
4' MIN.(1.2m)
18' MIN.(5.4m)
V+ V
+H+H
1
H+H
Figure 10. Ventilation avec trois coudes à 90°
23
VIENNA I
o
ELBOWS
H
2' MAX.(610mm)
3' MAX.(914mm)
4' MAX.(1.2m)
18' MAX.(5.4m)
= 40' MAX.(12.19m)
1
= 18' MAX.(5.4m)
1
VIENNA II
o
ELBOWS
H
2' MAX.(610mm)
3' MAX.(914mm)
4' MAX.(1.2m)
15' MAX.(4.5m)
= 40' MAX.(12.19m)
1
= 15' MAX.(4.5m)
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vienna-iiVienna iVienna ii

Table of Contents