Carrier 58MCA Installation, Start-Up, And Operating Instructions Manual page 44

4-way multipoise fixed-capacity direct-vent condensing gas furnace, series 140 (limited)
Table of Contents

Advertisement

LOAD CALCULATION
____________
Heating Load (Btuh)
____________
Cooling Load (Btuh)
____________
Furnace Model Selection
COMBUSTION AND VENT PIPING
Termination Location
________
Roof or Sidewall
________
Termination Kit — 2 Pipe or Concentric
________
Combustion-Air Pipe Length
________
Combustion-Air Pipe Elbow Quantity
________
Vent Pipe Length
________
Vent Pipe Elbow Quantity
________
Pipe Diameter Determined from Sizing Table
________
Pipe Sloped To Furnace
Pipe Insulation
________
Over Ceilings
________
Low-Ambient Exposed Pipes
Copyright 2000 CARRIER Corp. • 7310 W. Morris St. • Indianapolis, IN 46231
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4
PC 101
Catalog No. 535-758
Tab 6a 8a
CHECKLIST—INSTALLATION
Condensate Drain
________
________
________
________
________
CHECKLIST—START-UP
________
________
Thermostat Anticipator
________
________
Safety Controls Check Operation
________
________
Printed in U.S.A.
Form 58MCA-7SI
Unit Level or Pitched Forward
Internal Tubing Connections Free of Kinks
and Traps
External Drain Connection Leak Tight and
Sloped
Condensate Trap Primed before Start-Up
Heat Tape Installed if Required
Gas Input Rate
(Set Within 2 percent of Rating Plate)
Temperature Rise Adjusted
Anticipator Setting Adjusted or
Cycle Rate (3 Cycles per Hr) Selected
Primary Limit
Pressure Switch
Pg 44
1-00
58mca7si
Replaces: New

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents