Carrier 58MCA Installation, Start-Up, And Operating Instructions Manual page 24

4-way multipoise fixed-capacity direct-vent condensing gas furnace, series 140 (limited)
Table of Contents

Advertisement

VENT PIPE
HORIZONTAL TO ROOF
COMBUSTION-AIR PIPE
VERTICAL TO ROOF
NOTE: Moisture in combustion-air intake may be result of
improper termination. Ensure combustion-air intake pipe is similar
to that shown in Fig. 30, 31, 32, 33, or 34 so it will not be
susceptible to areas where light snow or other sources of moisture
could be pulled in.
If use of this drain connection is desired, drill out fitting's tap
plug with a 3/16-in. drill and connect a field-supplied 3/8-in.
tube. This tube should be routed to open condensate drain for
furnace and A/C (if used), and should be trapped. (See Fig.
29.)
2. Attach vent pipe as follows:
a. Determine location of vent pipe connection to inducer
housing as shown in Fig. 27 for application.
b. Reposition elastomeric (rubber) inducer housing outlet cap
and clamp to appropriate unused inducer housing connec-
tion. Tighten clamp.
Inducer housing outlet cap must be installed and fully seated
against inducer housing. Clamp must be tightened to prevent
any condensate leakage. Failure to follow this warning could
result in electrical shock, fire, personal injury, or death.
c. Install pipe support (factory-supplied in loose parts bag)
into selected furnace casing vent pipe hole. Pipe support
should be positioned at bottom of casing hole.
12 MIN
COMBUSTION-AIR PIPE
12 MIN
NOTE: A 12 In. minimum offset pipe section is recommended with
short (5 to 8 ft) vent systems. This recommendation is to reduce
excessive condensate droplets from exiting the vent pipe.
Fig. 28—Short Vent (5 to 8 Ft) System
VENT PIPE
HORIZONTAL TO SIDEWALL
COMBUSTION-AIR PIPE
VENT PIPE
VERTICAL TO SIDEWALL
d. Be certain that mating surfaces of inducer housing connec-
tion, elastomeric (rubber) coupling, and 2-in. diameter vent
pipe are clean and dry. Assemble the elastomeric (rubber)
vent coupling (with 2 loose clamps) onto inducer housing
connection. Insert the 2-in. diameter vent pipe through the
elastomeric (rubber) coupling and fully into inducer hous-
ing connection until it bottoms on the internal stop. Tighten
both clamps to secure the pipe to inducer housing. Tighten
the clamp screws to 15 in.-lb of torque.
Vent pipe must be installed and fully seated against inducer
housing internal stop. Clamp must be tightened to prevent any
condensate leakage. Failure to follow this warning could
result in electrical shock, fire, personal injury, or death.
NOTE: A 2-in. diameter pipe must be used within the furnace
casing. Make all pipe diameter transitions outside furnace casing.
VENT EXTENSION PIPE
Furnaces with 100,000 Btuh and larger inputs are supplied
with a PVC vent extension pipe (2-in. diameter by 12-in.
long). This pipe has a built-in channel to assist vent conden-
sate disposal. When this vent extension pipe is supplied, it
must be used to connect the field vent pipe to furnace inducer
housing on ALL upflow and downflow applications.
24
12 MIN
COMBUSTION-AIR PIPE
12 MIN
VENT PIPE
A96230

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents