KitchenAid KULSL85 Installation Instructions Manual
KitchenAid KULSL85 Installation Instructions Manual

KitchenAid KULSL85 Installation Instructions Manual

Automatic ice maker

Advertisement

Quick Links

Installation
Instructions
Kl+chenAtd
l
FOR THE WAY IT'S MADE:
and lower Panels . . . . . . . . . . . . . . . 2
. . . . . .-......,..,
3
., . . . 3
General Information . . . . . .,,,, 4
Unpack I.II..II..,,,,..,..I.,.,,,, 4
Utllltles I.............,........,.,,,,, 4
Locate unit . . . . . ..,.. I . . . . . . . . . . 5
Level unlt ......I.I...I ,,......,,,, 5
For the Plumber . . . . . . . . . . . . . . . . . . 6
Connect
to water . . . . . . . . . . 6
Connect
to draln . . . . . . . . . . . 7
draln pump . . . . 7
For the Electrician . . . . . . . . . . . . . . . 8
. . 8
. . . . . . . 8
How the Ice
Maker Works...... IIIIIIII...I.II 10
Things to Remember . . . . . . . . 10
Unit Wiring Diagrams . . . . . .,, 11
Check Operation . I I ,. . I I ., ., . 1 1
118004224230
Call our Consumer Assistance Center
wlth questlons or comments.
KITCHENAID" Automatic
Ice Maker
Model: KUlSl85

Advertisement

Table of Contents
loading

Summary of Contents for KitchenAid KULSL85

  • Page 1: Table Of Contents

    Unit Wiring Diagrams ..,, 11 Check Operation . I I ,. . I I ., ., . 1 1 118004224230 Call our Consumer Assistance Center wlth questlons or comments. KITCHENAID” Automatic Ice Maker Model: KUlSl85...
  • Page 2: Changing The Bin Door

    Changing the Bin Door and Lower Panels The storage bin door is designed to accept an optional decorative wood panel of your choice. The wood panel should be no more than l/4 inch (6 mm) thick. Cut it to the same size as the production metal panel.
  • Page 3: Thermostat Callbratlons

    hanging the Bin Door and Lower Panels Thermostat calibrations If ice maker is installed more than 2,000 feet remove thermostat, and follow the directions (600 m) above sea level, the Bin and Ice for turning the altitude adjustment screw as Thickness Thermostats must be adjusted shown in the label on each thermostat.
  • Page 4: General Information

    eneral Information 1. Lay carton on rear face and break open bottom flaps. 2. Set carton upright with all four flaps outward. 3. Lii carton up and off of machine. 4. Remove all tape and packaging materials from the outside and inside of the cabinet.
  • Page 5: Locate Unit

    eneral Information HEI locate unit Place unit so the front side will be com- pletely unobstructed to provide proper airflow. 2. Area should be well ventilated with This unit temperature above 55°F (13°C) and below MUST be 90°F 119°F (43°C). Best results are obtained installed (32°C) BEST...
  • Page 6: For The Plumber

    or the Plumber Connect to water (observe local codes) 1. Use W (6 mm) OD soft copper tubing for RIGHT END VlEW the cold water supply. W (19 mm) 2. Provide a convenient manual shut-off Water valve in the water line. inlet solenoid 3.
  • Page 7: To Draln

    the Plumber m Connect to drain (observe local codes) The unit is provided with a gravity drain. The ideal installation has a standpipe (1 Vi" mm] minimum) installed directly below the outlet of the drain tube. Refer to figures for the proper location of the standpipe.
  • Page 8: For The Electrician

    or the Electrician Electrical requirements A 115 Volt, 60 Hz., AC only, 15 or 20 It is recommended that a separate circuit, ampere electrical supply circuit, properly serving only this appliance, be provided. Use a receptacle which cannot be turned off grounded in accordance with the National Electrical Code and local codes and ordi- with a switch or pull chain.
  • Page 9: Operating Instructions

    perating Instructions CUllER GRID For complete operation information, refer to the Use and Care Guide. Vi” x?h” (19 mm x 19 mm) Before starting, wash out interior of cabinet with a Baking Soda solution (2 tablespoons grams] soda to 1 quart [l liter] of warm water).
  • Page 10: Maker Works

    ow the Ice Maker Works Compressor runs Water inlet valve opens Condenser fan runs Excess water is flushed out of the drain pan Water pump runs (circulates water) Cutter grid is warm to the touch Cutter grid is warm to touch NOTE: Normal harvest cycle takes 1 to WHEN THE DESIRED ICE SLAB THICK-...
  • Page 11: Unit Wiring Diagrams

    nit Wiring Diagrams This model operates at 115 volts except for the cutter grid circuit which operates at 8.5 volts at 1 amp. The compressor runs at all times except when the Bin Thermostat becomes satisfied and opens the circuit. This de-energizes system except for the transformer and cutter grid.
  • Page 12 Part No. 2175675 Printed in U.S.A. QD RegIstered Trademark /TM Trademark 01 KItchenAM. cb 1994 KlkhenAld...

Table of Contents