Tools Needed For Installation; Tools And Materials Needed - Bosch SHU 9950 Installation Instructions Manual

Hide thumbs Also See for SHU 9950:
Table of Contents

Advertisement

TOOLS & MATERIALS NEEDED

Tools Needed for Installation

Figure 1
Materials Needed
Additional materials may be required to comply with local codes.
Figure 2
Electric Connection - 2 conductor, 1 ground
insulated electrical supply cable (30" or
sufficient length for your installation).
Hot Water Supply Line - Minimum 3/8"
O.D. copper tubing or metal braided
dishwasher supply line.
Shut-off valve and fittings for hot water
supply line.
90° elbow with 3/8" N.P.T. external threads
on one end and sized to fit your water
supply line on the other end.
Teflon tape or other pipe thread compound
which help seal plumbing connections.
3 twist-on wire connectors for 16 AWG wire
(need to have metal inserts).
UL listed conduit connector or strain relief.
www.boschappliances.com
ENGLISH - 3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents