Throttle Linkage And Ignition Leads - Echo Power Edger PE-265 Operator's Manual

Power edger
Table of Contents

Advertisement

5. Tighten two (2) drive shaft clamp bolts (B) securely.
6. Route throttle linkage and ignition lead assembly along shaft and
clip as shown.

throttle lInkage and IgnItIon leads

1.
Close choke and remove air filter cover.
2.
Place throttle linkage (C) through adjustment fixture (D) and install
wire end into large carburetor throttle swivel hole (E). Check
throttle for freedom of movement and that wide open throttle / low
idle extremes are adjusted properly. The throttle linkage must be
adjusted by moving the adjustment fixture (D). Consult with your
Echo Dealer for correct adjustment procedure.
3.
Connect 2 ignition stop leads (F, G) from throttle cable tubing to 2
ignition leads (F, G) on engine.
4.
Secure ignition leads against engine housing with clip (H).
5.
Install air filter and cover.
P
ower
o
'
M
Perator
s
a
B
B
C
D
F
g
e
11
dger
anual
E
H
H

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pe-265s

Table of Contents