Requirements for DSU ..............1-10 Overview The Motorola Vanguard 100 Frame Relay Access Device (FRAD) connects serial devices to a Frame Relay network. This FLASH-based Vanguard is available either with or without an integral DSU daughtercard, DIM Site daughtercard, ISDN daughtercard, or Voice daughtercard, in a desktop-size standalone enclosure, as shown in Figure 1-1.
Page 2
This Offers... Configuration... mono FRAD DIM Port orderable as V.24, V.35, V.36, or V.11 V.24 interface mono FRAD with V.24 interface DSU daughtercard interface duo FRAD DIM Port orderable as V.24, V.35, V.36, or V.11 DIM Site daughtercard interface V.24 interface duo FRAD with DIM Port orderable as V.24, V.35, V.36, or V.11 V.24 interface...
Diagnostic loopbacks from the telephone company are supported. You activate local diagnostics from the Control Terminal Port (CTP). CTP Manageability You can manage the Motorola Vanguard 100 from the CTP for configuration, reporting, and troubleshooting. Vanguard 100 is available in two and three serial port versions. Ports have the following characteristics.
Page 4
Features Memory The board contains 1 Mbyte of FLASH memory and 2 Mbytes of DRAM. Default Report Log On software releases prior to 4.35, 140 data buffers were allocated for reports, for a Size total of 200 reports. For the 4.35 software, 10 data buffers are allocated for reports, for a total of 20 reports that can be logged on the Vanguard 100, thereby saving 130 data buffers.
Memory DRAM Recovery Memory DRAM Recovery Introduction On software prior to Release 4.35, 65 kilobytes was allocated for configuration memory size internally, which is identical to the allotment for the 6525. For the Vanguard 100, 65 kilobytes is unnecessary, since configuration memory size is only 8 kilobytes.
Power Source Choose a site that is within an appropriate distance of a power source. Depending on your application and the country in which you operate the Motorola Vanguard 100, this must be a grounded 100 to 240 VAC outlet.
Page 7
Pre-Installation Procedures Cable Clearance/ Allow at least 12 inches (30.5 cm) in back of the unit for air circulation and interface Air Circulation cable clearance. Refer to Figure 1-2. Caution To avoid overheating the unit’s circuitry, never place anything: • On top of the unit, •...
Vanguard 100 components are factory installed in the base unit. In addition to the Your Vanguard 100 base unit and accompanying components, the shipping carton may include a sleeve containing the power cord. Upon receipt of the Motorola Vanguard 100, check the contents of the shipping container as follows. Step Action Check the shipping carton and its contents for damage.
Page 9
Pre-Installation Procedures In Case of Damage If the equipment is damaged in transit, contact the shipper. If you have additional concerns in case of failure, about missing parts, or to return equipment, contact your nearest Motorola ISG representative. For Locations... Contact...
FCC Part 68 and Telephone Company Procedures and Requirements for DSU Before You Begin Before the Motorola Vanguard 100 can be connected to the network, you must: • Provide the local telephone company with the equipment’s registration number • Order the proper connections...