Finding Information Table of contents Please read & save this guide Finding Information ..........2 Thank you for choosing Electrolux, the new premium brand in home appliances. These Important Safety Instructions ........3 Installation Instructions are part of our commitment Shipping Pack............5 to customer satisfaction and product quality Dimensions .............6...
Important Safety Instructions What you need to know about safety instructions Warning and Important Instructions appearing in this guide are not meant to cover all possible conditions and situations that may occur. Common sense, caution and care must be exercised when installing, maintaining or operating an appliance.
Page 4
EVACUATE AND CALL THE FIRE • This blower assembly is approved for use with DEPARTMENT. the following Electrolux Telescoping Downdraft • NEVER PICK UP A FLAMING PAN - You may Systems: EI30DD10KSA, EI36DD10KSA, be burned.
(35.6 cm) 4-3/4” (12.1 cm) Discharge Adjustable Discharge List of Included Parts for model IMPORTANT EI16DDPRKS: Retain all packing and materials until the • (1) Blower telescoping downdraft and all components • (4) 1/4” Lag Bolts have been installed. Hardware Needed...
Planning Installation Planning Ductwork A qualifi ed technician must complete the installation Use galvanized or aluminum duct in 8” / 10” round or of this appliance. 3¼”x14” / 4”x14” / 4¾”x14” size, or a combination of both. PVC duct should be used if installing under a Carefully check the location where the remote blower poured concrete slab.
Installation of Blower Assembly Remove the Blower Cover Remove the Blower Cover from the Main Blower Housing by removing the (16) silver hex head screws DO NOT attach the Main Blower Housing directly from the Blower Cover. Retain the screws. to wall board, ceiling panels, or other non-structural Remove the Wire box from the Main Blower Housing materials.
Mount Main Housing to Structure When mounting the Main Blower Housing, the (4) When mounting the main blower housing, be sure lag bolts must be attached to joists or studs, or to fully engage the inlet collar of the blower with the other structural members.
Installation on Floor Joists Inlet Metal Duct Discharge Romex or Duct Metal Conduit Floor Joists Main Blower Housing Lag Bolts must be 1/4” Lag Bolts (4) attached to joists, studs or structural members. Conduit / Romex Flooring Inlet Discharge Floor Joist 1/4”...
Electrical Connections Remote Blower Electrical Connection Loosen the 3 terminal block screws. Insert the leads Before making any electrical connections, verify from the Romex cable into the terminal block and that the blower wheel spins freely. tighten the screws securing the leads in the terminal block.
Verifying Operation and Replacing Cover Verifying Proper Operation After making the required electrical connections, confi rm proper operation of the blower. 1. Temporarily re-install the remote blower cover, using 2 screws per side. 2. Turn on the power supply at the circuit breaker. 3.
Warranty Your appliance is covered by a one year limited warranty. For one year from your original date of purchase, Electrolux will repair or replace any parts of this appliance that prove to be defective in materials or workmanship when such appliance is installed, used, and maintained in accordance with the provided instructions.