TRANE
R
Pre-Start Up Checklist
TRANE AHU Pre-start up Checklist
General Information
Date
Project Name:
Trane Sales Order #
Trane AHU Model
Unit Serial No.:
Unit TAG #
Design Capacity (CFM) @ Design ESP
AHU Location
Area Served
Start-Up Contractor
T & C Technician / Engineer
Casing Installation Check
Exterior casing in good condition
Interior casing in good condition
Is the unit installation level?
Are the unit clearances adequate for service and operation?
Do all access doors open freely and are the handles operational?
Fan-Motor Installation Checks
Supply Fan
Return / Exhaust Fan
Have all shipping braces / brackets been removed?
Fan and Motor Alignment correct
Belt tension & condition good
Belt guard in place and secure.
Do the fan rotates freely?
Electrical Installation Checks
Electrical Cable entry at unit wall & motor terminal box is sealed.
Have all electrical connections been tested for tightness?
ohm
Insulation test done on motor winding.
ohm
Has overcurrent protection been installed to match unit nameplate
requirement?
Does the electical supply correspond to the unit nameplate?
External Power Disconnects in place and labeled.
Proper grounding Installed for motor and unit.
Motor Nameplate FLA
Amp
Amp
Installed Motor kW
kW
kW
Electrical Power Supply
Vac/Ph/Hz
Vac/Ph/Hz
Voltage Imbalance
%
%
63