Front View - Amana HVK03E Installation Instructions Manual

Ptac hydronic heat kit
Table of Contents

Advertisement

Steam Plumbing Dimensions
(2 places)
3-1/2"
5-3/4"
1" x 1-1/2"
opening for piping
Steam Outlet Connection
16-7/8"
16-3/4"
20-3/16"
COIL
1-1/2"
SIDE VIEW
5-1/2"
PTAC UNIT WALL SLEEVE
3-1/4"
1-7/8"
TOP VIEW OF COIL LOCATION
(with top grille and sheet metal removed)
1/2" I.D.
1-1/2"
5/8" O.D.
5/8"
Steam Outlet
Connection
Steam Coil Position
8-1/4"
Hydronic Air

FRONT VIEW

Inlet
(unit with Hydronic Kit installed)
COIL
COIL
Steam Inlet Connection
2-1/8"
53"
Figure 18
9
1-7/8"
3-1/4"
13-3/8"
2-1/4"
1" diameter
opening for piping
1/2" I.D.
1-1/2"
5/8" O.D.
5/8"
COIL
Steam Inlet
Connection
17-3/8"
Steam Trap (optional)
(NOTE: Steam Trap may be
installed on one or both
sides of Hyrdronic Unit)
COIL
1-1/2"
SIDE VIEW
(2 places)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hwk03e

Table of Contents