JOB PREPARATION
Before installing the hydronic kit, determine the following:
Whether a 2-way or 3-way normally open or normally
closed valve is required.
If an end switch is required to control the circulating
pump. (Information relating to U.L. approved valves
and current loads is shown on the kit label and is
repeated in the following figure).
NOTE: WHEN HYDRONIC HEAT IS USED, DISREGARD THE MINIMUM CIRCUIT AMPACITY AND MAXIMUM
FUSE SIZE SHOWN ON THE AUXILIARY NAMEPLATE FOR FIELD INSTALLED HEATERS. USE VALVES
SHOWN ON THE MASTER UNIT NAMEPLATE.
CAUTION: VOLTAGE RATING OF VALVE IS 24VAC AND DOES NOT CORRESPOND TO
VOLTAGE RATING ON THE UNIT NAMEPLATE.
THIS KIT MAY BE USED WITH ONE OF THE
FOLLOWING ELECTRIC CONTROL VALVES:
HOT WATER
ERIE MANUFACTURING CO.
654C0507EA01
654C0527EA01
654C0509EA01
654C0529EA01
VT2212G14A02A
VT2212G24A02A
VT3213G14A02A
BARBER-COLMAN
VA-1403-201
VA-1403-301
VA-3403-201
HONEYWELL
V8043A
V8043B
V8044A
Also, ensure that the following steps are completed and a
hydronic model chassis is installed before installation.
NOTE: The hydronic chassis MUST have a model
number in which the 10th, 11th, 12th or 13th digit
is H.
1. Wall sleeve is installed and completely sealed.
It must extend at least 3" and no more than 3-1/8" past
the finished interior wall in order to properly install the
hydronic kit.
2. All plumbing stub-outs are completed.
3. Unit chassis is uncrated, uninstalled, and not yet
connected to an electrical source.

INSTALLATION

The installation and servicing of the equipment re-
ferred to in this booklet should be performed by quali-
fied, experienced technicians.
Be sure to engage the services of a qualified water
treatment specialist to determine what water treat-
ment, if any, is needed. The manufacturer will not
assume responsibility for equipment failures resulting
from untreated or improperly treated water.
NOTE: WHEN HYDRONIC HEAT KIT IS
EMPLOYED, THE FOLLOWING LOADS
OPERATE CONCURRENTLY:
STEAM
654C0407EA01
UNIT VOLTAGE RATING
654C0427EA01
FAN MOTOR AMPS
VS2212G14A02A MOTORIZED VALVE, WATTS
VS2212G24A02A
VA-9224-201
MAX. WATER TEMPERATURE 200° F
VA-9214-201
MAX. WATER PRESSURE
200 PSIG
MAX. STEAM PRESSURE
5.0 PSIG
V8043J
230/208
265
.6
.6
6.5
6.5
This Installation kit includes:
Item
Qty
A
1
B
1
C
1
D
1
E
2
F
1
2
Description
Transition
Hydronic Skirt
Hydronic Top Assy
Hydronic Front Assy
Support Brackets
Bag Assembly containing:
Installation Instructions,
Gasket foam,
8 - 3/8" #8 screws
2 - 1/2" #8 screws
4 - 1/2" #10 screws
1 #10 machine screw
1 snap bushing
1 valve harness
4 wire nuts