Seagate BARRACUDA 50 Installation Manual page 23

Table of Contents

Advertisement

Barracuda 50 Installation Guide, Rev. A
3.
Configure termination power.
Terminators have to get power from some source. The
default configuration results in the drive not suppling termi-
nation power to the bus. You should normally leave this
drive set at this default unless your host system requires
that the drive supply termination power to the bus.
To configure this drive to supply termination power to the
bus, place a jumper on J2 pins 1 and 2 as shown in the fig-
ure below.
Term. Power to SCSI Bus
Host adapter or other device provides
term power to external terminator
J2 Jumper
(enlarged to
show detail)
Figure 5.
Setting terminator power jumpers
J2
S
D
M
E
S
E
J6
Drive
Front
Pin 1
Pin 2
R
R
W
P
E
E
T
P
D
S
S
P
J2
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

St150176lwSt150176lc

Table of Contents