Setting Up The Evaluation Board; Evaluation Board Jumpers And Connectors - Intel 440BX Manual

Scalable performance board
Hide thumbs Also See for 440BX:
Table of Contents

Advertisement

Getting Started
2.5

Setting up the Evaluation Board

Once you have gathered the hardware described in the last section, follow the steps below to set up
your evaluation board. This manual assumes you are familiar with the basic concepts involved with
installing and configuring hardware for a personal computer system. Refer to Figure 1 for the
location of connectors, jumpers, etc.
1. Make sure you are in a static-free environment before removing any components from their
anti-static packaging. The evaluation board is susceptible to electro-static discharge damage;
such damage may cause product failure or unpredictable operation.
2. Inspect the contents of your kit. Check for damage that may have occurred during shipment.
Contact your sales representative if any items are missing or damaged.
Caution: Connecting the wrong cable or reversing the cable can damage the evaluation board and may
damage the device being connected. Since the evaluation board is not in a protective chassis, use
caution when connecting cables to this product.
Figure 1. Evaluation Board Jumpers and Connectors
Connectors
ISA
Connectors
J21
J22
Post
Code
Debugger
Battery
16
PCI
AGP Connector
J5
J6
J7
J8
J9
J21 J22
U12 U13
U11
J23
J24
J24
J23
IDE Connectors
®
Intel
440Bx Scalable Performance Board Development Kit Manual
USB
Keyboard (Top) COM1 (Top)/
J2
J1
J12
J13
J17
J18
J20
J20
JP2
JP3
IDE2
IDE1
SDRAM
DIMM Slots
/Mouse
COM2
Parallel Port
LEDs
J3
D1
J4
D2
ATX Power
Connector
J14
J15
J14 J15
Floppy
Connector
J11
Fan Power
J2
Connector
Processor
Assembly
PGA370
Socket
J2
ITP
Debugger
Port
Special Mounting Holes

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents