Fisher & Paykel DOUBLE DISHDRAWER DD603I Accessory Installation Manual

Integrated panel preparation
Hide thumbs Also See for DOUBLE DISHDRAWER DD603I:

Advertisement

I N T E G R A T E D P A N E L P R E P A R A T I O N
FOR INTEGRATED DOUBLE MODELS DD603I
PLEASE NOTE: Your model of
FOLLOW THESE INSTRUCTIONS BEFORE REFERRING TO PRODUCT INSTALLATION INSTRUCTION SHEET P/N 526607.

BEFORE YOU START

The Door and Toe Kick Panels
R
of the
can be
made to match your kitchen
cabinetry. This diagram,
with the addition of your own
measurements will help you
calculate the required panel
sizes.
CABINETRY ALIGNMENT
The following calculations
assume:
The top of the Upper Panel is
to be aligned with the top of
the adjacent cabinetry. The
final panel/cabinetry alignment
is achieved by adjusting the
R
's feet
WIDTH OF ALL PANELS
Measure
the width between adjacent door/drawer fronts and write it
in the first box below, then complete the equation. For example:
1
24
/
" (616mm)
2 x
4
2x
HEIGHT OF UPPER PANEL
5
For example:
15
/
" (398mm)
8
standard height
5
15
/
8
(398mm)
standard height
D O U B L E
(NOTE: FOR SINGLE
R
may differ from the model shown in the diagrams. Diagrams have been simplified to enable clearer instruction.
1
3
/
" (2.5mm)
24
/
" (611mm)
32
16
door clearance
width of all panels
door clearance
width of all panels
3
7
(
/
" (2.5mm) MIN)
(23
/
" (595mm) MIN)
32
16
5
0mm
15
/
" (398mm)
8
door extension
height of upper panel
door extension
height of upper panel
(0" recommended)
R
MODELS, REFER TO BACK OF THIS BOOK)
HEIGHT OF LOWER PANEL
Measure
door/drawer height (or equivalent) and write it in the first
box below, then complete the equation. For example:
30" (762mm)
15
height of upper panel
1
MIN 28
/
" (717.5mm) +
4
Note: The 'Door Extension'
to be above the
Important!
The air vent between the Upper and Lower Panels must not be
5
covered. An air gap of
/
part number 526608 J
R
5
5
/
" (398mm)
/
" (8mm)
8
16
air gap
5
/
16
(8mm)
height of upper panel
gap between
panels
(12
allows for the top of the Upper Panel
where required.
R
" (8mm) MUST be provided.
16
US
06/2004
(page 1 of 6)
open
1
14
/
" (356mm)
16
height of lower panel
height of lower panel
17
/
" (311.5mm) MIN)
64

Advertisement

Table of Contents
loading

Summary of Contents for Fisher & Paykel DOUBLE DISHDRAWER DD603I

  • Page 1: Before You Start

    D O U B L E I N T E G R A T E D P A N E L P R E P A R A T I O N FOR INTEGRATED DOUBLE MODELS DD603I (NOTE: FOR SINGLE PLEASE NOTE: Your model of may differ from the model shown in the diagrams.
  • Page 2 BEFORE YOU START IMPORTANT INTEGRATED PANEL THICKNESS Upper and Lower Panel minimum thickness is thicknesses above ” (18mm) can be accommodated but product depth will increase accordingly. INTEGRATED PANEL MATERIAL Drawer Front material must be suitable for damp conditions (122 F/50 C @ 80% RH) and adequately sealed to withstand moisture.
  • Page 3 PANEL PREPARATION INSTRUCTIONS READ THESE INSTRUCTIONS COMPLETELY AND CAREFULLY. STEP 1: BADGE AND HANDLE POSITION STEP 2: BADGE CUT-OUT & BRACKET REMOVAL (Not shown to scale) BADGE AND HANDLE POSITIONS On both Panels, select the Badge position to suit the cabinetry design, within the available badge zones.
  • Page 4: Securing The Mounting Brackets

    PANEL PREPARATION INSTRUCTIONS STEP 3: FITTING THE HANDLE AND BADGE STEP 4: SECURING THE MOUNTING BRACKETS FITTING THE HANDLE Fit the customer supplied handle. WARNING! When mounting the handle, be sure fastenings do not protrude beyond the back surface of the Panel. FITTING THE BADGE Fit a Badge to each Panel by feeding the wires through to the back and pressing the Badge into the cut out.
  • Page 5 PANEL PREPARATION INSTRUCTIONS STEP 5: SECURING THE TOE KICK PANEL STEP 6: GROUNDING THE MOUNTING BRACKETS AND CONNECTING THE BADGE WIRES NOTE: If using the supplied Black Prefinished Toe Kick, proceed to Step 6 Grounding the Mounting Brackets and Connecting the Badge Wires. Place Toe Kick Panel face down on a soft surface and mark a vertical center line.
  • Page 6: Customer Care

    PANEL PREPARATION INSTRUCTIONS STEP 7: FITTING THE PANELS TO THE PRODUCT CUSTOMER CARE If you have any questions concerning the installation of this , please contact your Fisher & Paykel Authorized Service Agent. Fisher & Paykel Appliances 27 Hubble Irvine CA 92618 Toll Free 1 888 9 FNP USA...
  • Page 7 S I N G L E I N T E G R A T E D P A N E L P R E P A R A T I O N FOR INTEGRATED SINGLE MODELS DS603I (NOTE: FOR DOUBLE PLEASE NOTE: Your model of may differ from the model shown in the diagrams.
  • Page 8: Parts Supplied

    BEFORE YOU START LOW INSTALLATIONS Use this diagram if installing the IMPORTANT INTEGRATED PANEL THICKNESS Panel minimum thickness is 16mm. Panel thicknesses above 18mm can be accommodated but product depth will increase accordingly. INTEGRATED PANEL MATERIAL Drawer Front material must be suitable for damp conditions (122 F/50 C @ 80% RH) or adequately sealed to withstand moisture.
  • Page 9 PANEL PREPARATION INSTRUCTIONS READ THESE INSTRUCTIONS COMPLETELY AND CAREFULLY. STEP 1: BADGE AND HANDLE POSITION STEP 2: BADGE CUT-OUT & BRACKET REMOVAL (Not shown to scale) BADGE AND HANDLE POSITIONS On both Panel, select the Badge position to suit the cabinetry design, within the available badge zone.
  • Page 10 PANEL PREPARATION INSTRUCTIONS STEP 3: FITTING THE HANDLE AND BADGE STEP 4: SECURING THE MOUNTING BRACKETS FITTING THE HANDLE Fit the customer supplied handle. WARNING! When mounting the handle, be sure fastenings do not protrude beyond the back surface of the Panel. FITTING THE BADGE Fit the Badge to the Panel by feeding the wires through to the back and pressing the Badge into the cut out.
  • Page 11 PANEL PREPARATION INSTRUCTIONS STEP 5: GROUNDING THE MOUNTING BRACKETS STEP 6: CONNECTING THE BADGE WIRES WARNING! Be sure the Product is not plugged in. Plug the green Badge grounding wire onto a Mounting Bracket tab. Plug the grounding wire from the Product onto the other Mounting Bracket tab. WARNING! The mounting bracket MUST be grounded.
  • Page 12 PANEL PREPARATION INSTRUCTIONS STEP 7: FITTING THE PANELS TO THE PRODUCT CUSTOMER CARE If you have any questions concerning the installation of this , please contact your Fisher & Paykel Authorized Service Agent. Fisher & Paykel Appliances 27 Hubble Irvine CA 92618 Toll Free 1 888 9 FNP USA...

This manual is also suitable for:

Ds603i

Table of Contents