Download Print this page

Yard Machines 462B series Owner's Manual page 6

5 h.p./8 h.p.
Hide thumbs Also See for 462B series:

Advertisement

ATTACHING THE CHIPPER CHUTE (Model 465A 8 H.P. chipper shredders only)
Chipper
Chute
Weld Stud (A)
Weld Stud (A)
Hex Nut
Weld Stud (A)
_tep 13.
Remove
the three cupped washers and hex nuts from the weld studs beside (A) the opening
on the left side of the housing.
Step 14.
Remove the two hex bolts, lock nuts, and flat washers from the two holes on the upper end
of the brace.
15.
Place the chipper
chute over the weld studs so the slot on the chute is towards
the bottom,
Align the three holes on the chute with the three
weld studs,
p 16,
Replace the three cupped
washers
(cupped
side against
the chipper
chute) and hex nuts that
you removed
in step 13. Do not tighten
the nuts at this time. Make sure to place the cupped
side of the washer against the chipper
chute.
Step 17.
Your unit is shipped
with one end of the brace already
secured
to the lower frame.
Loosen
the bolts securing
the brace to the frame.
Step 18.
Align the holes on the chute with the holes on the brace.
Step 19.
Attach
brace to chipper
chute with the hardware
removed
earlier from the brace.
See the
illustration
above for proper
order.
Tighten.
Step 20.
Tighten
the bolts securing the brace to the frame.
Step 21,
Tighten
the three nuts on the weld studs holding
the chipper
chute to the flail housing.
6

Advertisement

loading

This manual is also suitable for:

465a series