Removal And Replacement Of Control Water Valve - Hoshizaki FS-1001MLH Service Manual

Modular flaker
Hide thumbs Also See for FS-1001MLH:
Table of Contents

Advertisement

G. Removal and Replacement of Control Water Valve
1) Turn off the power supply, remove the panels and close the water supply line shut-off
valve.
2) Disconnect the terminals from the control water valve.
3) Loosen the fitting nut on the control water valve inlets and remove the control water valve.
Do not lose the packings inside the fitting nut.
4) Remove the water supply hose from the control water valve.
5) Install the new control water valve.
6) Assemble the removed parts in the reverse order of the above procedure.
7) Open the water supply line shut-off valve.
8) Check for water leaks.
9) Replace the panels in their correct position, then turn on the power supply.
47

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fs-1001mlcFs-1001mlh-cSrc-10h

Table of Contents