LG LMVM2277ST Installation Instructions Manual page 6

Hide thumbs Also See for LMVM2277ST:
Table of Contents

Advertisement

PARTS, TOOLS, MATERIALS
You will need the following tools and materials for the installation:
Carton or other heavy material for covering the counter top.
Clear Tape
(for taping the templates to the wall)
Saber Saw
-
(for cutting vent holes for roof
or wall venting)
Phillips Screwdriver
Stud Finder
Pencil
Flat Blade Screwdriver
Measuring Tape
Small Side Cutters or Tin Snips
Keyhole Saw (for the power cord hole)
Electric Drill
3/8" and 3/4" wood drill bits c_"
1/2" and 3/16"
_
drill bits
Plumb Line
Duct Tape
Caulking Gun
Gloves
• If you have brick or masonry walls, you will need special hardware and tools.
• The ductwork you need for the installation is not included. All wall and roof caps must have a back-draft damper.
(Shown on page 5)
-6-

Advertisement

Table of Contents
loading

Table of Contents