GE CSCP5UGXAFSS Owner's Manual And Installation page 24

Side by side refrigerators 22, 23, 25 and 27 models
Table of Contents

Advertisement

Available languages

Available languages

Installation Instructions
INSTALLING THE REFRIGERATOR
(CONT.)
[] REPLACE THE BASE GRILLE
Replace
the grille
by installing
the two
Phillips
head screws.
[] START THE ICEMAKER
Set the icemaker
power
switch
to the
I (on) position.
The icemaker
will
not
begin
to operate
until
it reaches
its
operating
temperature
of 15°F (-9°C)
or below.
It will
then
begin
operation
automatically.
It will take 2-3 days to
fill the ice bin.
NOTE:
In lower
water
pressure
conditions,
the
water
valve
may turn
on up to 3 times
to deliver
enough
water
to the icemaker.
[] SET THE CONTROLS
Set the controls
to the recommended
setting.
5
5
[.EOOMME.OEO
CO.T.O'SE ..OS]
0 *F IS RECOMMENDED
37 *F IS RECOMMENDED
24

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents