Craftsman 113.177825 Owner's Manual page 6

12 gallon full blowing wet/dry vac
Table of Contents

Advertisement

Caster/Caster
Foot Assembly
1. Remove the power assembly from the
dust drum and set aside.
2. Turn the dust drum upside down on the
floor.
3. Insert the caster feet into the bottom of
drum, as shown (4 places).
4. Push on the caster foot until the foot is
flush with bottom of the dust drum.
5. Insert the caster stem into the socket of
the caster foot, as shown (4 places).
6. Push on the caster until the ball on the
caster stem is inserted all the way into
the socket. You wilt hear the ball snap
into the socket and the caster will swivel
easily when positioning is correct.
7. Turn the drum upright.
C as'e r ___.
CcaaSt_rr S;: i_
ou.,
Vac Assembly
1. Line up vacuum port in power assembly
with drain cap located on the front of
the drum.
2. Place power assembly on top of drum
with the handles snug against the drum
channel.
3. Be sure power assembly completely
covers the top of the drum so leakage
does not occur.
4. Push down on top of the handles to
cause the flexible locking tabs to hook
onto the drum lip of the channel.
5. Make sure that the locking tabs are
snapped in place to prevent the power
assembly from coming off. (See inset
below.)
,
w'nmel_
._Power
Assembly
/_Vacuum
Port
_D_wn
Pull
cDa ru
_
Out
>...__
Flexible
Lid_
_
__
_;:_
Lockibng
Handle
_Ta
/_
Drain
Not Force Flexible
Beyond Stop Tab
Stop_
Drum
Tab
Out
Flexible Locking Tabs

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents